Rich Kinder - Executive Chairman Steve Kean - Chief Executive Officer Kim Dang - Chief Financial Officer Dax Sanders - Chief Financial Officer, KML Ian Anderson - President, KML.

Analysts

Jean Ann Salisbury - Bernstein Brandon Blossman - Tudor, Pickering, Holt Shneur Gershuni - UBS Ted Durbin - Goldman Sachs Darren Horowitz - Raymond James Craig Shere - Tuohy Brothers Jeremy Tonet - JPMorgan Chris Sighinolfi - Jefferies Michael Blum - Wells Fargo Linda Ezergailis - TD Securities Becca Followill - U.S. Capital Advisors.

Operator

Welcome to the Quarterly Earnings Conference Call. At this time, all participants are in a listen-only mode until the question-and-answer session of today's conference. [Operator Instructions] This call is being recorded. If you have any objections, you may disconnect at this time. I would now like to turn the call over to Mr.

Rich Kinder, Executive Chairman of Kinder Morgan. You may begin..

Rich Kinder Executive Chairman of the Board

Okay. Thank you, Natalie, and welcome to the Kinder Morgan quarterly analyst call.

Before we begin, as usual, I'd like to remind you that today’s earnings releases and this call includes forward-looking and financial outlook statements within the meaning of the Private Securities Litigation Reform Act of 1995, the Securities Exchange Act of 1934 and applicable Canadian provincial and territorial securities laws, as well as certain non-GAAP financial measures.

Before making any investment decisions we strongly encourage you to read our full disclosures on forward-looking and financial statements, and use of non-GAAP financial measures set forth at the end of our earnings releases, as well as review our latest filings with the SEC and the Canadian provincial and territorial securities commissions for a list of important material assumptions, expectations and risk factors that may cause actual results to differ materially from those anticipated and described in such forward-looking and financial outlook statements.

Let me begin the call by saying that at the end of 2015 we made a very difficult decision to reduce our dividend for the first and only time in KMI's history. We said we would work hard to strengthen our balance sheet and fund our growth CapEx from our internally generated cash flow without having to issue equity or additional debt.

And that when we had made sufficient progress on those goals, we would begin to return additional value to our shareholders through some combination of dividend increases and/or stock repurchases.

Since that time, we have reduced our debt by approximately $5.8 billion and funded all of our CapEx out of operating cash flow while paying a dividend of $0.50 per share per year. Today we are happy to announce multiple steps to return significant value to our shareholders.

We plan to increase our dividend for 2018 by 60% from the current level of $0.50 per year to $0.80 per year beginning with the dividend payable for Q1 of 2018. We then expect to continue to increase the dividend by 25% per year '19 and '20, resulting in a dividend of $1.19 and $1.25 in 2020.

Additionally, our board today authorized a $2 billion share buyback program also expected to begin in 2018. We intend to take these steps while continuing to strengthen our balance sheet by funding all our growth capital needs at KMI out of operating cash flow without the need to issue equity or incur additional debt.

We expect to maintain best in class coverage for our dividend, for example about 2.5 times coverage in '18 and two times or better in '19 and '20. To sum up, we intend to fund our growth CapEx needs at KMI from internally generated cash flow and return excess cash to our shareholders through a growing dividend and share repurchases.

And with that, I will turn it over to Steve..

Steve Kean

Okay. Well, that’s the big announcement. I am going to take you through KMI performance highlights and then turn it over to Kim Dang, KMI's CFO, to take you through the financials.

Following that, I will update you on KML and turn it over to Dax Sanders, CFO of KML, to give you the KML financial update, and then we will take your questions on both KMI and KML. So starting with KMI. We had a good second quarter and a good first half of year.

Performance was a little better than planned for the quarter and the first half of the year. As we said on the first quarter call, recalling that timing and expect to be essentially flat to plan for the year after adjusting for the impact of the IPO of 30% of all of our Canadian pipelines and terminals assets as a result of the IPO.

Also, we have now completed the two key steps that we outlined at the beginning of the year to strengthen our balance sheet and put us in a position to return value to shareholders as Rich told you. Number one, we completed that JV of our Elba Island liquefaction project in the first quarter. That was consistent with our budget assumptions.

And in this quarter we secured acceptable financing for our Trans Mountain expansion project. With those steps now complete, we project to end 2017 with a debt to EBITDA ratio of 5.2 times versus the 5.4 we projected at the beginning of the year. It's worth noting a couple of things from the KMI perspective on KML.

By creating an entity with all of Kinder Morgan's existing Canadian assets and taking that entity public, we established a business that is broader than the expansion project. These assets include our existing pipeline and terminals asset networks in Canada, including what we believe is the best merchant terminal position in the Edmonton hub.

The Edmonton position is a network with facilities interconnected with each other and with Trans Mountain and third party pipelines. We continue to expand that network with our base line terminal project which I will get into in the KML portion.

The Canadian pipelines and terminals businesses produced a little under $400 million of EBITDA Canadian, in 2016. The strength of this business and it's opportunity to grow further creates an entity that can raise its own capital for the $6.1 billion in remaining spend on the expansion.

In fact, we closed shortly after the IPO on a construction credit facility that Dax is going to take you through in a bit. So we were able to strengthen KMI'S balance sheet using the IPO proceeds to pay down debt, secure an acceptable means of funding our largest expansion capital project which will benefit both KMI and KML shareholders alike.

Now a few KMI business segments performance highlights for the quarter. First, the backlog currently stands at $12.2 billion. That’s an increase from last quarter. We had new project additions in gas and CO2 which outpaced projects that were placed in service primarily in the terminals segment.

We continue building out this backlog which we expect will contribute significant EBITDA to the segments when complete. Overall project management performance has also been quite good, delivering results that are consistent with our investment decisions.

We are also, and I would say especially in natural gas, seeing additional opportunities on the horizon across multiple fronts, whether it's producer push projects out of the Permian, additional power plant connections, export needs to Mexico and LNG as well storage opportunities.

In our natural gas segment, we saw transport volumes increase year-over-year, Q2 to Q2, by 3%. Key contributors were Mexico exports which were up 8% year-over-year, higher LNG exports coming off of our pipes, and partially offset by lower power demand. On the other hand, our gas gathering volumes were down year-over-year by 12%.

Gathered gas volumes were up in Bakken but down in both Eagle Ford and Haynesville, and overall we are seeing volumes flattening to slightly recovering in our key basins. Recall that our gas segment is 55% of our segment earnings before DD&A and gathering and processing is only 18% of that number.

We signed an additional 280 a day of long term firm transport agreements in the quarter, bringing the year-to-date increment to 680 a day and our total sign up of the last three and half years to 8.7 Bcf a day of which 2.4 Bcf was existing previously unsold capacity showing again that the rise of natural gas production and demand creates expansion opportunities but also adds value to the existing network.

We continue to make good progress on our 1.8 Bcf a day Gulf Coast Express proposed project which goes from the Permian to a connection at Agua Dulce in South Texas with our existing Texas Intrastates system.

We are not putting it in our backlog at this point but we have got a good offering to the market and we are progressing our commercial discussions towards firm commitments. We also continue to see interest in our Permian capacity on EPNG which has some very economics that is low capital, expansion opportunities to get more gas to Waha.

The overall summary on gas is that we continue to expect long term benefit in this sector from increased LNG and Mexico exports, power and industrial demand and those should continue to drive the demand for the transportation and storage infrastructure that we own. Shifting over to our products pipeline segment.

Refined products volumes, NGLs and crude and condensate transport volumes were all up year-over-year.

The benefits of these higher volumes were offset by some settlements, the project write-off on Plantation and the sale of our interest in Parkway pipeline last year, all of which weigh in to leave us slightly down year-over-year on the segment's earnings before DD&A basis. Getting back to the volumes.

Refined products volumes were up 2.2% year-over-year versus an EIA overall market growth number for April and May of 1.5%. NGL volumes are up 14% year-over-year. And in contrast to our gathered volumes, our crude and condensate transport volumes are up year-over-year on our Eagle Ford that is our KMCC asset and our Bakken pipe.

Bakken performance is due in part to the delay of DAPL, the KMCC volumes I think are an indicator of the great connectivity and superior location of that system. We have made excellent progress during the quarter on our Utopia pipeline project. Recall that we receive an adverse decision on eminent domain in one of the Ohio circuit courts last year.

Our team did an excellent job of acquiring the necessary right of way, including reroutes and the purchase of an existing pipeline. And so in the quarter we finished acquiring all of the required right of way and we are now about one third complete on pipeline construction and on target for our scheduled January 1, 2018 in service.

Really fine work and fine recovery by the project team on Utopia and, again, scheduled to be on time on January 1, 2018. In our terminals business, the segment earnings before DD&A were up 2% versus Q2 last year primarily as a result of contributions from projects coming on line in our liquids business which makes up about 80% of this segment.

Our leasable capacity in liquids was up 2%, our utilization remained very strong at 95%. Both volumes were also up year-over-year. 4.7%, which was led by performance in pet coke and steel. Our commercial team wisely remained aggressive in keeping all of our Jones Act vessels under charter and discounting as necessary to do so.

And we have all of those vessels under charter today and took delivery of two during the quarter. One at the very end of the previous quarter and one during the quarter. In CO2 we experienced a lower effective oil price compared to last year and lower oil volumes but we are on plan in this segment.

We experienced record CO2 production in April and higher volumes year-over-year for the quarter Q2 this year to Q2 last year. We are also seeing promising results from our recent [indiscernible] activation programs at Sacroc, and from our Tall Cotton Residual Oil Zone development which is now producing over 2000 barrels a day.

So overall, a strong quarter. Strong financial performance. Continued progress on our project execution. Completion of a key milestone in our effort to strengthen our balance sheet and position us to return value to shareholders. And with that I will turn it over to Kim Dang..

Kim Dang Chief Executive Officer & Director

Thanks, Steve. We are declaring a dividend today of 12.5 cents per share consistent with our budget. On the performance let me hit the high points first and then I will take you through the details. I will start with the GAAP numbers and then I will move to DCF, which is the way that we look at and think about the numbers and performance.

Earnings per share and adjusted earnings per share are both flat versus the second quarter of 2016.

DCF per share which is the primary way we judge our performance, is a penny lower versus the second quarter of 2016, or approximately $28 million, primarily attributable to the sale of 50% of SNG, the KML IPO transaction in which we sold a 30% interest in our Canadian assets, as well as higher sustaining CapEx and cash taxes.

For the second quarter and year-to-date DCF per share is ahead of our budget but that’s largely timing with sustaining CapEx being the largest contributor. For the full year, after the impact of the KML IPO, we would expect DCF to be on budget. Taking the impact of the KML IPO into account, we expect DCF to be less than 1% below budget.

On the balance sheet, we ended the quarter at 5.1 times debt to EBITDA, down from 5.3 at the end of last year and at the end of the first quarter as a result of paying down debt with the approximately $1.25 billion in net proceeds that we received from the KML IPO.

Our debt balance for the second quarter came in lower than what we expected, primarily because some expansion CapEx got shifted from the first half of the year to the second half of the year. Therefore, we still expect to end the year at 5.2 times as we previously communicated.

On the expansion CapEx front, we are forecasting $3.1 billion for the year. That is down from our budget of $3.2 billion. The $3.1 billion does not include any KML CapEx, including spending on Trans Mountain from June forward as we expect KML to be a self funding entity.

Because of the equity that KMI has contributed to fund the Trans Mountain project prior to the IPO, KML has the capacity to draw on a construction facility to fund its CapEx for the balance of the year. If you take a broader view, the Trans Mountain expansion has $6.1 billion in remaining spend.

It's got a $4 billion revolver and so there is about $2.1 billion gap and we expect KML to be able to finance the balance itself which Dax will take you through when he walks through KML. Now for some detail.

Looking at the preliminary GAAP income statement, you will see that revenues are up by 7% on the quarter but cost of sales is up by more resulting in $114 million reduction in gross margin. A similar phenomenon to what we saw in the first quarter of this year. The sale of 50% interest in SNG accounts for $112 million or 98% of the [sale] [ph].

Therefore if you exclude the sale, gross margin would be essentially flat which is pretty consistent with how we view our overall results for the quarter. As I said earlier, both earnings per share and adjusting earnings per share are flat for the quarter versus the comparable prior period.

Net income available to common shareholders in quarter was $337 million, or $0.15 per share, versus $333 million, also $0.15 per share in the second quarter of 2016.

Net income available to common shareholders before certain items or adjusted earnings, was $304 million or $0.14 per share versus the adjusted number in 2016 of $322 million also $0.14 per share. Certain items in the first quarter of this year were a benefit of $34 million. The most significant was a reserve release on a litigation matter we settled.

Certain items in the first quarter of 2016 were net benefit of $8 million. Now I am going to turn to the second page of financials which shows our DCF for the quarter and year-to-date and is reconciled to our GAAP numbers in the earnings release. As I said earlier, DCF is the primary financial measure on which management judges its performance.

We generated total DCF for the quarter of $1.022 billion versus $1.05 billion for the comparable period in 2016, down $28 million or 3%. Looking at the breakdown of the quarter-to-quarter change. Segment earnings before DD&A and certain items is down $66 million. Natural gas is the largest driver, down $54 million.

The SNG joint venture impact was approximately $73 million in the quarter. So absence the sale, the natural gas segment would be up slightly.

Although the SNG transaction overall was dilutive to DCF, the segment impact of $73 million overstates this impact as their benefits reflect in other lines with the primary benefit coming in interest expense as we use the proceeds from that transaction to pay down debt.

CO2 segment is down $8 million or 4%, primarily associated with lower oil production at Sacroc, primarily as we reallocated capital to projects that had higher returns but longer lead times. The terminals and products variances in the quarter are small and largely offset. The Kinder Morgan Canada variance is also small.

G&A is a net benefit of $16 million quarter-to-quarter primarily as a result of the SNG sale and lower franchise taxes.

Interest expense is a benefit of $43 million in the quarter versus the second quarter of 2016, as a result of the SNG joint venture transaction and the KML IPO as we use the entire net proceeds from both transactions to pay down debt.

Cash taxes and sustaining CapEx are higher by about $30 million versus the second quarter of last year but we expected and budgeted both cash taxes and sustaining CapEx to be higher than last year by even more than the $30 million.

So there is some timing on these items between the first half of the year and the second half of the year relative to our budget.

Totaling those quarter-to-quarter variances, segment is down $66 million, G&A a benefit of $16 million, interest a benefit of $43 million, and cash and sustaining a combined increase of $30 million, results in a variance of $37 million. The last piece of the variance relates to SNG.

In our adjustments to convert net income to DCF we add back JV DD&A and subtract our sustaining CapEx to more closely reflect the cash we expect to receive from our JV.

Because SNG is a JV in the second quarter of 2017 versus fully consolidated asset in the second quarter of 2016, there is approximately a $10 million benefit to JV DD&A between the two periods.

The net impact of KML for the period is buried in some of the line items I have discussed because it's small, less than about $5 million when taken into account the interest benefit.

DCF per share was $0.46 versus $0.47 for the first quarter of the prior year, or down a penny, all of which is associated with the DCF variance I just walked you through. The $0.46 per share results in over $740 million of excess distributable cash flow above our 12.5 cent dividend for the quarter and $1.68 billion year-to-date.

As I said earlier, for the quarter and year-to-date we are ahead of our budget but for the full year we expect to be on our budget when you exclude the impact of the KML IPO. The effect of the IPO will be seen primarily in two places.

One, in net income attributable to non-controlling interest which will reflect an expense for the public's 30% of net income which will be somewhat offset by interest expense which will reflect a benefit as we use the IPO proceeds to pay down debt. Including the impact of the KML IPO, we expect DCF to be less than 1% below budget.

And with that I will move to the balance sheet. We ended the quarter with net debt of $36.6 billion and net debt to adjusted EBITDA of 5.1 times. Debt is down year-to-date $1.56 billion and it is down in the quarter $1.24 billion.

To reconcile that for you, in the quarter it is pretty easy, we are down $1.24 billion of debt and the IPO proceeds were $1.25 billion. So essentially everything else nets out but to take you through some of the details, DCF was $1.022 billion as I previously mentioned.

Investments, our investment programs, expansion CapEx and contributions to equity investment was a little over $875 million. We paid dividend of $280 million and then we have working capital and other items of $129 million.

Source of working capital which was primarily associated with accrued interest as most of our interest payments are made in the first and third quarters. Year-to-date we have reduced debt by $1.56 billion and so to break that down for you. We generated DCF of $2.24 billion.

We had $1.64 billion in investing activity between expansion CapEx and contributions to equity investments. We received $1.25 billion in IPO proceeds. We had a little over $450 million from asset sales in JV proceeds, primarily the Elba promote. Our partner's catch up of its equity contributions and the sale of some of our non-core terminals.

We paid dividends of $560 million and we have working capital and other items that were a use of capital of $178 million, which were a whole host of items that include use of cash for inventory, primarily natural gas purchases. Property tax payments, a lot of which occurred in the first quarter.

Debt issuance cost associated with the KML construction facility and accrued interest. So with that I will turn it back to Steve..

Steve Kean

Okay. Now we are going to turn to KML. I will give the update and then Dax will take you through the numbers and also couple of key updates. So just a reminder, KML consists of all of the Kinder Morgan Canadian pipelines and terminals assets.

So those include our existing Trans Mountain Pipeline system which runs for and is the only outlet for Alberta crude to a world oil market price. It also includes of course, the Canadian $7.4 billion expansion to triple the capacity of that system.

KML also includes the Puget Sound system which takes oil from the Trans Mountain Pipeline and delivers it to Northwest Washington State refinery. A market that we would expect to grow over time. KML includes the Canadian portion of the Cochin system which delivers condensate to Alberta for blending with the oil sands crude for transport.

Crude comes down from the oil sands to our merchant terminal position in Edmonton, among other places, where it can move down Trans Mountain or third party pipeline, or through one of our joint venture crude by rail facilities.

We have built our Edmonton position over the last ten years and continue to expand it with our Base Line Terminal joint venture with Keyera, which is the Canadian $366 million investment to our share. That’s on time and on budget with the first tanks coming on line in January of 2018.

Finally, Vancouver Wharves, our multi-commodity bulk terminal in Vancouver harbor and the Gateway terminal for mineral concentrates both coming into and out of Western Canada is also part of KML.

So in all, KML is comprised of two strong, existing business platforms that are integral to fulfilling the transportation, blending and storage needs of producers and refiners. They have substantial upside associated with Trans Mountain expansion as well as other potential expansion.

On the Trans Mountain project, I will remind you that in Q1 we reached a significant milestone. We increased our cost estimate about the contractual cap. The cap was $6.8 billion Canadian and our revised estimate is 7.42. That gave our shippers the right to turn back capacity.

At the investor conference in January we expressed our confidence in the market need for the project and in fact when all was said and done, all 708,000 barrels remain under long-term contract.

But now with the increase told, which includes return on the additional capital spend as well, we ended up with only 3% of the barrels turn back and those were taken up in an open season. The contracts are predominantly 20 years with one 15-year contract.

So we had essentially reconfirmed the value and need for the project with a 2017 line up of shipper needs based on 2017 market conditions including oil sands condition. Also recall that we have built in protections for the costs that are more difficult for us to estimate and control on the project.

These uncapped costs associated with, among other things, the most difficult mountain and difficult urban portions of the build, if higher than shown in our cost estimate result in an adjustment to our total which includes not only recover of the cost but also the project return on those costs incurred.

By the same token reduced costs flow through to the benefit of our shippers and our shippers benefit from the fact that other portions of our cost are capped. And we would absorb the overrun there, if any.

We also received our environmental approval for British Columbia earlier in the year and of course our federal government approval finding that the project is in the public interest of Canada. So in the quarter we made our final investment decision of approving the project.

We made a public offering that included all of Kinder Morgan's Canadian assets and we secured financing. As we are moving into project execution, we are finalizing rates with contractors, we are ordering materials, readying for construction start in September.

And we are doing that with substations first nations support, support from the federal government on a project of vital national interest, support from the Alberta government and with our BC environmental order in hand, and with significant financing sources already secured. And with that I will turn it over to Dax..

Dax Sanders Vice President & President of Products Pipelines

Thanks, Steve. Before I get into the results and outlook, I want to highlight a couple of occurrences on the bank capital markets project. First, we received our initial ratings from the agencies and consistent with our expectation we received a rating of BBB from S&P and BBB high from BBRS.

On the financing front, as Steve mentioned, we closed on a financing package that consists of $4 billion base facility, a $1 billion contingent facility, and a $500 million working capital facility.

All of which positions us well to access the significant portion of the capital we need to build the Trans Mountain project including accessing the Canadian pref market as we discussed on the road show.

As I move in to review of the results, I want to preface my comments with the caveat that while I will be offering quarter-over-quarter comparisons, those comparisons are of limited value at this point given that we are reporting a quarter where KML was owned by the public for a part of the quarter and will be compared to a quarter where it was wholly owned by KMI and during those periods part of the IPO there were shareholders loans in place that generate significant effect, most of which is unrealized interest and other items not reflective of the true earnings power of KML.

Therefore, we would ask you to focus on the outlook for 2017 which you will see is consistent with what we discussed on the road show. Quarter-over-quarter variances will mean over time and obviously we don’t have a published budget for KML as a standalone company but starting with our budget cycle this year we will published one just as KMI does.

Now moving to the results and outlook for 2017.

Today we are announcing that the KML board has declared a dividend for the second quarter and an inaugural dividend for KML of $0.0571 per restricted voting share which corresponds to pro rata percentage of the $0.65 annualized we suggested on the road show, adjusted for the 32 days in the second quarter that KML went public.

With respect to performance and as Kim did with KMI, I am going to walk you through summary items and then will provide incremental details starting with the GAAP numbers and moving on to DCF, which is the metric we believe is most reflective of performance.

With respect to earnings and net income, earnings per restricted voting share is $0.11 for the quarter which is derived from $25 million of net income which is down from approximately $52 million of net income for the same quarter in 2016.

Adjusted earnings which adjusts for certain items is $36 million compared to $46 million for the same quarter in 2016.

With respect to DCF, DCF per restricted voting share was $0.083 for the quarter which is derived from total DCF for the quarter of approximately $79 million versus $86 million for the comparable period in 2016, down $7 million or approximately 8%.

That provides coverage of approximately $2.8 million and reflects a payout ratio of approximately 69%, again consistent with what we talked about on the road show. Now moving to the detail. Looking at the preliminary GAAP income statement, I want to point out the unusual item that is driving almost $27 million decrease.

FX moved from a gain of $5.8 million to a loss of $16 million. That $21.8 million swing was mostly related to the revaluation of the intercompany loan between KMI and KML that were repaid at the consummation of the IPO, again consist with the message on the road show.

And the items that drove $18.5 million of that $21.8 million, were classified as certain item. The remaining 3.3 of the swing not attributable to certain items and included in the variances for net income, EBITDA and DCF, was largely attributable to the settlement of intercompany AR and AP between KMI and KML and the revaluation of U.S.

dollar bank accounts at KML. Going forward, while there may be some unrealized FX associated with intercompany AR and AP, now that KML is a standalone public company, those items will be settled on a monthly basis and unrealized FX should be much less. Now let's turn to the second page of the financials.

Those are DCF and is reconciled for our GAAP numbers in the earnings release. Segment EBDA before certain items was $10 million compared to Q2 2016 with the pipeline segment down approximately $11 million and the terminals segment up about a million.

The largest pieces in the pipeline segment was timing and integrity expend at Cochin, OpEx at Trans Mountain and lower revenue on Puget. At the terminals segment, we had higher Vancouver Wharves throughput and revenue offset by higher O&M at Vancouver Wharves. G&A is essentially flat.

Interest cost is $4.4 million lower versus Q2 2016, primarily as a result of the repayment of the intercompany loans and greater capitalized interest associated with the project. Total certain items for the quarter were $10.5 million tax affected, with the largest piece being the intercompany FX that I mentioned.

The remaining 1.3 is related to certain JV IPO costs that were booked to the Canadian business, prior to the IPO. Both cash taxes and sustaining capital were essentially flat compared to the same quarter in 2016. Now moving on to some specifics for the full year 2017.

We expect EBITDA for the full year 2017 including pre and post-IPO periods to be just under $400 million and we expect DCF to come in at approximately $320 million. Both of those are consistent with the $395 million and $318 million of 2016 EBITDA respectively that we highlighted during the IPO. One item to highlight.

You will recall that we recognized equity ADC as part of both EBITDA and DCF which is a product of how much CapEx we spend on the project. So EBITDA and DCF will be affected by the amount and not end timing spend on the project. With that I will move on to a few short comments on the balance sheet.

From the end of the year to June 30, cash increased approximately $35 million which is mainly due to a draw on the construction debt and working capital facility that I mentioned. Other assets increased $290 million which are primarily attributable to CapEx spending.

On the right hand side on the balance sheet, debt decreased by almost $1.2 billion and that was a result of paying off the intercompany loan. As of June 30, KML had total debt of $189 million which was attributable to $190 million drawn on the construction and working capital facility. And with that I will turn it back to Steve..

Steve Kean

Okay. We are ready to take questions on both KMI and KML..

Rich Kinder Executive Chairman of the Board

Natalie, if you will go ahead, we will take questions now..

Operator

[Operator Instructions] Our first question comes from Jean Ann Salisbury from Bernstein. Your line is now open..

Jean Ann Salisbury

So now that the IPO is now behind you, I was wondering if you could give a little more color on the contract process that you are wondering -- sorry, that you are running.

And how you decided on the IPO and anything in hindsight that you would have done differently or maybe just communicated differently?.

Steve Kean

No. We were, I think very clear in that we were pursuing both projects simultaneously and we were maintaining a certain amount of competitive tension as a result. So we fully prosecuted both processes simultaneously. I think the considerations around the IPO that were attractive were project governance.

I mean you can only have one driver of the car when you are executing on a project of this magnitude. Certainly we viewed the value proposition as good.

We thought that by combining all of our Canadian assets into one entity, we are creating a very attractive prospect for the market and had the ability to self fund the capital needs of the entity going forward. So, overall, it made sense for us to do the IPO and that’s the result we ended with..

Jean Ann Salisbury

And could you just give a little more color on why you decided to do this between the share buyback and the dividend raise. I know you had many trajectories that you could have followed..

Steve Kean

Yes. So we think that we are generating cash that’s in excess, that’s surplus. So it's in excess of our needs for our capital projects while we are building them out and so we see the room to return essentially all of that excess cash to shareholders. And which shows a significant dividend increase.

I think that’s a very positive for shareholders, but also a share repurchase which is kind of unique in our sector that gives us the ability to be opportunistic when we see an opportunity to purchase -- to return value to shareholders through a share repurchase rather than locking it all in on the dividend increase.

So we think it's a good mix of ways to return capital to shareholders, return value to shareholders. Substantially growing dividends, still very well covered, extremely well covered as Rich pointed out, with a buyback program as the backstop which gives us some flexibility to take advantage of opportunity..

Rich Kinder Executive Chairman of the Board

And I would add that opportunistic purchases of shares is certainly something we would be interested in, particularly since right now our share to DCF ratio is about five turns below our peer group average. So we think that’s mispriced in that sense..

Operator

Our next question comes from Brandon Blossman from Tudor, Pickering, Holt and Co. Your line is now open..

Brandon Blossman

Sounds like a pretty good day on your side of the call. So, I guess, let's start with KML. A decent equity currency there.

Clearly there is a little bit of equity funding to come but maybe it's too early and not a fair question, but where do you see that entity ultimately going to in terms of public float, size? What kind of strategic things could you do with that particular entity over time?.

Dax Sanders Vice President & President of Products Pipelines

Yes. So first in terms of the public. We do not intent as KMI to sell down additional shares from our interest. But the entity may do primary offerings to help raise the capital needed to fund its expansion. We also talked about on the road that it is a good currency and there are opportunities on the M&A front that we would like to consider.

And we will do that. Those are very hard to predict or to call, or forecast, as you know. But we think there are some good opportunities out there and we like a lot of the assets that we see in Western Canada. So I think it is a good currency. We think it will help us raise capital and also maybe an acquisition currency..

Brandon Blossman

Got it. Nice answer. More detailed question.

Gulf Coast Express, what is the timeline to getting that into the backlog as you see it today?.

Steve Kean

Yes. As I said, we are trying to ripen some very strong interest into firm agreement. We think that that is a matter of weeks to months in order to get that done. Again, we think we are making a very good offering to the market out there.

We provide good takeaway capacity from Waha into South Texas where it connects with our intrastate system which we are very proud of. It reaches all the key markets that I think producers will be looking for takeaway.

Houston ship channel is now a premium market in the gas market and that’s driven by the fact that we have got LNG, power gen, pet chem development and Mexico demand. That pulls very hard on our system. And so we think we have a very fine offering and there is a strong degree of interest in it but we are not counting it until we got them all in..

Operator

Our next question comes from Shneur Gershuni from UBS. Your line is now open..

Shneur Gershuni

Just a couple of quick follow up questions. Just for starting off with Jean's question about the buyback versus the dividend. I guess kind of -- I was wondering how much did the current stock price and your current multiple relative to peers play into the decision to shoot for a buyback.

And then I was wondering if you can comment about the duration or the expectation of how long it will take you to execute the buyback.

Is it something we should think as ratably over three years or something that you would like to achieve sooner than that?.

Rich Kinder Executive Chairman of the Board

Well, I think first of all what we have given you is an outline of the future for the time period '18,'19 and '20. So I think you can expect it over those three years. Obviously, we will be opportunistic in the way that we utilize those funds for stock repurchases.

But we think this is a very strong combination of having a dividend increase that is substantial, 60% next year and 25% in two years after that. Together with some fire power reserve for opportunistically buying back our own stock. While at the same time, funding all of our expansion CapEx with internally generated funds.

And you know that really does two things. It keeps a very nice ratio of coverage of the dividend which I think is important. And, secondly, it continually improves the balance sheet because we are using our own internally generated funds to produce assets that will generate more EBITDA.

So I think it's a win-win all the way around the horn and that’s our reasoning process..

Shneur Gershuni

Okay. Good answer. And as a follow up question with respect to Gulf Coast Express. I know there is a lot of interest in the open seas and from your prepared comments 2019 sort of seems to be the target.

Do you sense if that can potentially be brought up sooner than that, just given the level of interest? And any sense on how much would it cost, kind of like an estimate per mile that we should be thinking about..

Steve Kean

We are in a competitive situation and we are not giving you our cost estimates for reasons I am sure you understand. I think, look producer timing is a little bit different. It varies from one to another and there are some shippers who are more in a hurry than others.

And because we are talking about a Texas intrastate build not a FERC certificate build, we may be able to accommodate earlier in service states for those customers who are in a bigger hurry. At least giving them to some market outlet. And so we are definitely in discussions about how we can go about doing that.

And having it as a Texas intrastate project gives the flexibility to do that that we wouldn’t have in an interstate natural gas pipeline project..

Shneur Gershuni

Okay. And just two little housekeeping questions.

On TMX, is there sign offs you need from BC to keep the construction date on schedule, and do you have the CO2 spend for the quarter?.

Steve Kean

You want to give the CO2 spend first?.

Kim Dang Chief Executive Officer & Director

Sure. CO2 spend for the quarter was 118 million including our overhead allocation..

Steve Kean

Okay. And Ian Anderson, President of KML is here and he can answer your question on BC..

Ian Anderson

Yes. On BC, as you know we have got our primary environmental certificate from BC, we got earlier this year. And we continue to need a good number of local permits from British Columbia and Alberta for that matter as they relate to crossings, road crossings, utility access, crown lands etcetera.

And those permits are continuing to be advanced and filed and work continues on them with British Columbia and with Alberta in line with our construction schedule that will have us commence in September..

Operator

Our next question comes from Ted Durbin from Goldman Sachs. Your line is now open..

Ted Durbin

Just following up on that last question. I guess, we do have a new government and it does seem that they are opposed, it sounds like, to TMX expansion. I guess how are you going to navigate some of the objections that have been brought up by this new government.

What road blocks or obstacles might we need to watch for as you move forward into construction..

Steve Kean

Yes. Ted, as we said, the permitting process is ongoing. It's continuing to progress and we feel comfortable with that in line with our construction plan. I am not going to speculate on what an NEP government might do in British Columbia at this stage in order to advance their views.

We remain very confident in the federal decision that we have and the jurisdiction that the project has federally. I have worked cooperatively with several provincial and federal governments over the years of the development of this project and I want to do the same with Premier Horgan's government.

I do look forward to talking to him soon and updating him on the project and our ongoing commitments to engage with communities and first nations as that’s a project that’s in the national interest. So I think we will just wait and see what Premier Horgan wants to do and I look forward to his call..

Ted Durbin

Okay. Great. And then if I can come back to the buyback and not just buyback versus dividend but buyback versus, call it organic growth. I guess would you be buying back shares now given the choice of using your capital there versus sanctioning a new project at, let's just say the average build multiple.

Maybe seven times build multiple that you have in backlog right now.

How do you think about that choice?.

Steve Kean

We think about it in terms of the return for the capital that we are deploying. And we think at the current stock price that is an attractive investment opportunity for us.

We have a significant build out which we have already accounted for in our backlog in determining what the surplus cash was and have the flexibility to add additional projects to it.

But the commitment we are making is that over and above the cash that we need in order to invest in capital projects, we are going to return essentially all of that to shareholders. It's going to be in the form of a dividend but also in the form of share buybacks where those make sense..

Ted Durbin

Okay. Great. And then one last one and I just wanted to be clear on this. There is a mention of Kinder Morgan Canada being self funding. Does that imply that you will no longer consolidate the debt that you will incur to build TMX or is that still going to come through in terms of your debt to EBITDA calculation..

Kim Dang Chief Executive Officer & Director

No. We will consolidate KML. We will consolidate the EBITDA, we will consolidate the debt. And so that will be in our numbers. What I meant by self funding is, I mean we don’t expect at this point that KMI will have to contribute equity into KML or buy KML's equity. It is another way to say it, in order to help KML fund the expansion project..

Steve Kean

And just to be clear, those numbers starting from $6.1 billion remaining funds necessary to construct were Canadian dollars numbers that Kim was mentioning. So I think she gave you, Ted, a pretty clear path showing how KML really will be self funding..

Operator

Our next question comes from Darren Horowitz from Raymond James. Your line is now open..

Darren Horowitz

Congratulations on the enhancements to enhance shareholder value. My first question, Steve, with regard to the Permian gas volumes at Waha in the South Texas, and you all have done a good job outlining this.

But can you just give us at least a rough sense of what you think the scale and cost of EPNG capacity expansions could look like and more importantly, how you balance committing capacity on that line versus Gulf Coast Express.

Obviously if Gulf Coast Express, at least by our math, gets committed to 1.7 and 1.8 Bcf a day, it's going to be north of a billion dollar project. That’s going to have a different return threshold relative to what you can do on EPNG, again by our math.

And then bigger picture, do you think logistically, it's just a situation where the magnitude of downstream demand pull out of Waha could handle both the potential for 1.8 Bcf of commitments on Gulf Coast Express talk with Dulce as well as scaling up EPNG..

Steve Kean

Okay. Good questions. So the key thing to understand is really the expansions on EPNG are really complementary to the Gulf Coast Express project. So the EPNG expansions are about getting gas to Waha and just simplistically I mean what Gulf Cost Express is about is by getting gas away from Waha to the premium market that is now in East Texas.

And so they are very complementary. In terms of the capital on EPNG, as I mentioned, we have got some fairly significant volume opportunities, one tranche of which is out in an open season right now and then potentially at subsequent open season. And these numbers like 500 million a day [comp] [ph] on one of the open seasons.

And there isn't a significant amount of capital that’s required. So think of things like just being able to direct more gas to Waha by installing back pressure valves and additional meters and the like.

Those are relatively modest capital expenditures and so we think very attractive and, again, very complementary to what we are trying to accomplish on Gulf Coast Express..

Darren Horowitz

As a follow on, Steve, how much of a competitive advantage is it of yours that you guys can help backstop not only the capacity on Gulf Coast Express but also some of these expansions, the complementary expansions on EPNG. Just given the fact that you guys can buy one plus Bcf a day of gas across the system..

Steve Kean

Yes. And we think it gives us an advantage and it is on both ends of this system.

As you point out, EPNG has a nice network in the Permian and to the extent we can feed additional gas to Waha, which we believe we can at attractive returns for the small amount of capital that we would spend there, that’s going to help set that, provides a good supply end for Gulf Coast Express.

And then on the market end, as I mentioned, we think we have got an excellent Texas Intrastate system that’s tied in with Mexico, LNG, pet chem demand, power demand, Houston ship channel industrial demand, and utility demand in the Greater Houston area. It's a great network with great connectivity.

And so Agua Dulce used to kind of be in the middle of nowhere. You can get to Agua Dulce and now you can get to Houston which is all of a sudden really somewhere in terms of value for the gas molecule..

Operator

Our next question comes from Craig Shere from Tuohy Brothers. Your line is now open..

Craig Shere

You said about no borrowings just for growth CapEx.

Was that intended to mean through 2020?.

Rich Kinder Executive Chairman of the Board

Yes..

Craig Shere

Okay. And is that -- do you think that’s long term efficient or are you questioning the size of your growth CapEx..

Rich Kinder Executive Chairman of the Board

No, look in developing our dividend policy for the next three years which we are unveiling this afternoon, we looked at our expected capital needs from now through 2020, and obviously concluded that we had room to raise the dividend and still fund all of our capital needs internally and we use the excess to buyback share.

So that’s all factored in and we anticipate that we will continue to fund all of that growth capital with internally generated funds. I think we sometimes miss on all the noise what a huge consistent generator of cash flow this company really it.

And I think what we are talking about this afternoon really demonstrates that when you look at what we are talking about in terms of being able to maintain a significant capital expenditure budget and still increase the dividend and still have some money left over for buying back shares on an opportunistic basis..

Steve Kean

So the other important aspect to that Craig is that it helps us continue with some natural delevering and continue to strengthen the balance sheet. So for the longer term, and we have been saying this for a while, what we are really aiming for is a strong investment grade balance sheet and we expect to see some natural continuing delevering there.

We are not done with that. A growing return of value to our shareholders in the form of a growing and well covered dividend and share repurchases, both of which we discussed today, announced today. And then having the continued capacity to fund new capital investments.

And so we think that we have struck this right in terms of what's going to create value for our shareholders overall..

Craig Shere

Well, Steve or maybe Kim, if you want to chime in.

Do you see at the end of this three year timeframe getting to a point where you don’t really need to worry about enhancing the balance sheet? Maybe it would be more opportune into the next decade to start funding half of growth CapEx for opportunity sets, let's say seven times EBITDA with some low cost debt..

Steve Kean

Yes. Absolutely..

Craig Shere

Well, that sounds good. And then my last follow up. All this kind of is predicated on the ability to sustain long-term new project origination. Can you comment in the quarter about the specifics about the gas pipes and CO2 projects originated and can you opine about the recurring opportunity set to get to that $2.5 billion a year figure.

Do you see the EPNG and Gulf Coast Express that you have talked about as kind of indicative of the opportunities in front of you and that there will be more of that over time..

Steve Kean

Yes. So narrowly we have been constantly kind of reallocating capital and adding some capital to CO2 where we see good returning project.

In gas we had a project for an LDC customers as well as some gathering and processing CapEx that got added, and what that was offsetting was in the terminals business we had taken delivery of a ship that’s now under charter, has been under charter. So those were the small pieces.

But really as I said, you know if you, particularly in gas we are seeing opportunities. Gulf Coast Express is kind of the headline one but we are seeing good opportunities that are being driven by power demand, the need to connect power plants, to some extent by gathering and processing, but also Mexico, and LNG.

And so we are seeing the need, I mean natural gas demand and production is growing over the longer term and that’s going to drive some opportunities for us. And we have a great network. And so that means it doesn’t have to be a Greenfield expansion. It could be an expansion off of an existing that is better.

It could be an expansion of an existing part of our network where we can potentially gain higher returns. So we are starting to see that, I would say particularly in the natural gas sector..

Operator

Our next question comes from Jeremy Tonet from JPMorgan. Your line is now open..

Jeremy Tonet

Just wanted to dig in a little bit more on the repurchases.

Did you guys say what date that would start and kind of any more color you are willing to provide around what level would make sense to repurchase? Sounds like between current level is about [indiscernible]?.

Steve Kean

We announced over the timeframe of 2018 to 2020, and so that’s the time for you over which we are talking.

As said earlier, we think our shares are a good investment at current prices and we are looking to return essentially all of our cash in excess of capital needs to our shareholders and with the dividend level we have set today, with the capital opportunities we see today, we believe that’s going to leave a substantial amount of cash that’s available for share repurchase over the period.

And then finally we do expect to be opportunistic which means we will be price sensitive in how we do our share repurchases. We haven't set a target price and we are also not just going to be mechanically buying at the market.

So those are broad parameters I know but I think we have given a pretty good set of guidance on $2 billion share buyback program over this three year period..

Jeremy Tonet

Great. Thanks for that. And just wanted to follow up on the capital markets. It sounds like you guys don’t need to access equity or debt markets because surplus cash flow is going to cover all your growth CapEx.

Would it be fair to say you would only go to the market to something kind of upside materializes and you wanted the capital for that?.

Steve Kean

What we are trying to do is position ourselves -- what we have done is position ourselves not to have to access the capital markets, whether that’s debt or equity. You know it's hard to project whether there might be some set of circumstances in which that makes sense to do but what we have done is make sure that we don’t have to..

Kim Dang Chief Executive Officer & Director

And we will be accessing debt markets to refinance maturing debt but what we are talking about here is financial growth CapEx..

Jeremy Tonet

Great. And just one last one. Just wanted to follow up on TMX timeline extension.

Just want to see, when is activity really going to pick up for the construction? Have you guys ordered the pipe yet or how should we think about the CapEx outlay that came out there?.

Steve Kean

Yes. As far as the construction planning goes, we have initiated our first pipe order. We are finalizing our contracts with our general contractor and I expect those to be finalized sometime between now and middle of August. Construction activity will commence in September, according to plan.

We won't have mechanical construction of the pipeline underway until early next year and that was all was the plan, and that’s all in line with the completion date of the end of 2019..

Operator

Our next question comes from Chris Sighinolfi from Jefferies. Your line is now open..

Chris Sighinolfi

Just have a couple of follow ups on some of the topics already hit. I guess to start, the dividend and share repurchase questions. Obviously not trying to pin you to any firm commitment in terms of timing or cadence, but the KMI old dividend increases were nearly a quarterly event.

So I am just curious if you are planning to sort of resume that type of cadence or pivot to like an annual step up that a utility company, for example, might do..

Rich Kinder Executive Chairman of the Board

It's an annual step up. What we are saying is and we said in the release that the increase, for instance, next year is going to be $0.56 to $0.80 that will begin with the first quarter next year. So in other words the dividend that we pay for the first quarter of 2018 will be $0.20 and it will be applied for the year.

And then again we would anticipate taking that from $0.80 to a dollar and then a dollar to $1.25 and we would just flatten that out over the year..

Chris Sighinolfi

Okay. All right. And then I think I understand it but just want to clarify, in terms of the authorization. I guess I am a little bit curious as to how the board determined the magnitude of the share repurchase authorization.

It sounds like, but I don’t want to read in if this is not what you intended, it sounds like $2 billion is where the number that you could envision executing or exhausting between 2018 and 2020. Is that the right way to interpret that or was it just a nice round number that we can have out there..

Rich Kinder Executive Chairman of the Board

Well, it is a nice round number but you have interpreted it correctly. That’s, look we gave a lot of work, hundreds of hours, Kim and her team with input from all of our business segments to develop this on the bottoms up basis.

And when it came out with, we stress tested, we looked at it from a lot of different vantage points, and this we thought was the optimum structure and that’s the number that came out in the wash.

We will see how all this plays out over those three years but that’s certainly our game plan, as we said, is to take the dividend up and have that amount of money left to buyback shares. And again very importantly, continue to improve the balance sheet because we are funding our capital expenditures out of cash flow..

Chris Sighinolfi

Two additional questions, if I could. Just a clarification on KML side. I guess the point around, obviously the consolidation. So, Kim, just to clarify, your comment about $3.1 billion of expansion CapEx, that was sort of the net to KMI portion but what we should see represented on the cash flow statement is a consolidated figure over time..

Kim Dang Chief Executive Officer & Director

That’s right. So I think in our Q we have put in a CapEx table in there. The CapEx that we are expecting for the year and we are going to break it out between KMI and KML because we will be consolidating KML so that you can see the total consolidated and you can see the KMI only piece..

Chris Sighinolfi

Okay. And then related to, Steve -- I think, Steve, that question about KML financing strategy. I know in the S-1 you guys were talking about maybe preps and maybe some distribution recycling.

I was just curious, I know you said you are not planning to sell down KMI's interest but do you have any refined guidance as to what you are planning to do with the cash distributions on the KMI's own portion.

Does that get recycled at all or is that...?.

Kim Dang Chief Executive Officer & Director

Yes on the KMI piece we will probably do 25% of our distribution we will reinvest..

Chris Sighinolfi

Okay. And do we just think about that then, Kim, as you effectively using that to buy additional equity but it keeps the cash on the balance sheet up there to fund the program..

Kim Dang Chief Executive Officer & Director

It's funding the expansion CapEx, yes..

Chris Sighinolfi

Okay. And then just final question for me. Does the debt fair value adjustment figure came down precipitously in 2016. It's been hovering around $1.1 billion for the last couple of quarters.

Just curious, as you go through the refinancing, as debt maturities come up and you place new debt to replace that, should we see that number continue to drift lower or any guidance as to how we can think about that might be helpful..

Kim Dang Chief Executive Officer & Director

Well, the debt fair value number moves for a number of different reasons. One, as interest rates move, and two, as our credit spreads move.

And so if you can, knowing where interest rates are going to go, you have to know where interest rates are going to go and where our credit spreads are going to go to be able to predict what's going to happen with that over time. And so, I mean if you look at where we can finance a ten-year right now, we can issue around 4%.

And the maturities that are coming up in the near-term are going to be at higher rates than that..

Operator

Our next question comes from Michael Blum from Wells Fargo. Your line is now open..

Michael Blum

I guess first question is, you previously talked about a five times target for leverage. Is that still the target and if so what do you think is the timeline to achieve it now..

Kim Dang Chief Executive Officer & Director

Well, I think that is the target and I think we have made substantial progress towards that target which is why we felt comfortable with the dividend and share repurchase guidance that we are giving today. If you look at our debt balance at 9.30 of 2015 with the end of the last quarter before we reduced the dividend, we paid down $5.8 billion.

Over $5.8 billion in debt since that period. And so now I think the deleveraging is going to come through two methods. One as EBITDA grows, as these projects come on. And two, because we are funding our projects with 100% equity because we are funding it with the retained cash flow.

And so we will continue to make progress towards the five times, but it's going to be a little slower in reducing that leverage than we have been to date because we are returning some value to shareholders at this point in time given that we have a little bit more flexibility with our balance sheet..

Michael Blum

Okay. And then for your dividend guidance out to 2020, you gave some coverage targets as well. What are you assuming for growth capital as a run rate from 2018 to 2020 to sort of pay out that dividend, maintain the coverage, the buybacks etcetera..

Kim Dang Chief Executive Officer & Director

It varies by year. And so, basically we ran off the backlog and then we made some assumptions around what we thought opportunities would look like. So we did put in some unidentified capital in there and to the extent that we have had a high probability project that weren't in the backlog, we would have included those as well.

So we tried to take a holistic look at what we thought CapEx would look like going forward, not just running after backlog..

Michael Blum

Can you say what the kind of average annual is for the three years?.

Kim Dang Chief Executive Officer & Director

I don’t remember what it was, Michael..

Operator

Our next question comes from Linda Ezergailis from TD Securities. Your lines is now open..

Linda Ezergailis

I appreciate the update on the Trans Mountain expansion, permitting and construction timeline. I was just wondering if you could maybe also give us a sense of what might define the tempo of construction in terms of potentially any sort of gating factors tied to permitting or other considerations that might affect the pace of construction.

Or what sort of slack you have built in to account for some uncertainties?.

Steve Kean

Yes. I think, Linda the way to think about it is that commencing this fall, the bulk of the work is going to be preparation for major construction commencing next year and that was all was the plan. So the permit acquisition and the priority of permitting activity is built around that.

So I think that you look at what you need to do to prepare to construct and with things like clearing and terminal work and preparation of sites etcetera. So that’s the kind of activity that we will likely be involved in this year commencing in September, with more the heavy lifting occurring early next year..

Linda Ezergailis

Okay. Thank you.

And would you be able to perhaps stratify the remaining $6.1 billion cost between parts, labor and anything else?.

Steve Kean

I don’t have that right in front of me, Linda. Obviously, the bulk of the cost, our labor cost, the bulk of those cost will be incurred in '18 and '19 with the peak sometime in later '18. But I don’t have it stratified to any degree than that..

Ian Anderson

Yes. So I think that, if you look at it, the construction is still to come, so that’s going to be construction, equipment, materials, all of those things. The amounts that would have been spend to this point would have been more around land acquisition and permitting cost and the like.

So now the costs going forward are going to be more of construction and materials and equipment. Construction including labor..

Operator

Our next question comes from Becca Followill from U.S. Capital Advisors. Your line is now open..

Becca Followill

Just following up on Michael's question. You are targeting I think 5.1 times debt to EBITDA at the end of '17. Target is to get to five times. If you are funding 100% of your capital needs with cash flow, that seems like that would take you well under or just slightly under the five times going into 2018. So you would already be there.

Then you have access to cash. So can you help me reconcile that with a buyback over a three year period and the target of five times..

Kim Dang Chief Executive Officer & Director

Yes. First of all, I think what we have said is, we are at 5.1 times today at the end of the second quarter. So we would expect to end the year at 5.2 times that we ended the quarter on our debt balance a little bit lower than we were expecting because some of our expansion capital flushed to the second half of the year.

I think we are still on target to end next year at 5.2 times -- end '17 at 5.2 times. Then next year on a fully consolidated basis, we are going to show the Trans Mountain revolver, the Trans Mountain construction facility in our number. And so our debt to EBITDA numbers will be bearing the full load of the expansion CapEx.

And so it will take some time, even though we are funding all of our other CapEx with 100% equity, it will take some time to bring that down to 5.0..

Operator

Speakers, there are no questions in queue at this time..

Rich Kinder Executive Chairman of the Board

Okay. Well, thank you very much, everybody. We view this as really important day at KMI and we are glad you were here to ask your questions. Thank you..

Operator

Thank you. And that concludes today's conference. Thank you all for your participation. You may now disconnect..

ALL TRANSCRIPTS
2024 Q-3 Q-2 Q-1
2023 Q-4 Q-3 Q-2 Q-1
2022 Q-4 Q-3 Q-2 Q-1
2021 Q-4 Q-3 Q-2 Q-1
2020 Q-4 Q-3 Q-2 Q-1
2019 Q-4 Q-3 Q-2 Q-1
2018 Q-4 Q-3 Q-2 Q-1
2017 Q-4 Q-3 Q-2 Q-1
2016 Q-4 Q-3 Q-2 Q-1
2015 Q-4 Q-3 Q-2 Q-1