Ladies and gentlemen, thank you for standing by. And welcome to the BEP Third Quarter 2019 Results Conference Call and Webcast. At this time all participant lines on a listen-only mode. After the speakers' presentation, there will be a question-and-answer session. [Operator Instructions]I'd now like to hand the conference over to your speaker today, Mr.

Sachin Shah, Chief Executive Officer. Please go ahead, sir..

Sachin Shah

Thank you, operator. Good morning, everyone, and thank you for joining us for our third quarter 2019 conference call.Before we begin, I'd like to remind you that a copy of our news release, investor supplement and letter to unit holders can be found on our website. I also want to remind you that we may make forward-looking statements on this call.

These statements are subject to known and unknown risks and our future results may differ materially. For more information, you're encouraged to review our regulatory filings available on SEDAR, EDGAR and on our website.Our business continued to perform well in the third quarter as we advanced our key strategic priorities.

Our priorities remain focused on deploying capital for value, improving our operations and maintaining our high levels of liquidity and a strong balance sheet. Our objective as always is to deliver total returns on a per unit basis of 12% to 15% over the long-term.

We remain committed to continuing to broaden our investor base, facilitating increased demand and enhancing trading liquidity for Brookfield Renewable. As our business continues to grow and globalize, we are seeing increased demand from prospective investors.

As such, we are pleased to announce that we are creating a structure that will allow our investors additional optionality to invest in Brookfield Renewable through either the current partnership or through a newly created publicly listed Canadian Corporation known as BEPC.

Both of which will provide investors access to the same globally diversified renewable power portfolio with a strong track record of growth.BEPC will be created via an effective stock split and the Class A shares should be economically equivalent to the existing LP units as they will pay identical dividends and distributions, and the BEPC Class A shares will be exchangeable into the LP units at any time at the option of the holder.

We believe this initiative should support the expansion of our investor base by attracting new investors that are currently unable or unwilling to invest in our LP structure due to tax reporting or other attributes and will allow us to be eligible for certain indices or ETFs that the BEP LP units are not eligible for.During the quarter, we acquired a 200 megawatt recently constructed fully contracted wind farm in China for $45 million net to BEP.

We also continue to advance our distributed generation joint venture in the country, commissioning 8 megawatts of rooftop solar and advancing an additional 12 megawatts that we expect to be online by the end of the year. We continue to remain disciplined and measured on growth in China by looking for high-value low-risk investment opportunities.

We also advanced the build-out of our development projects globally. We remain on track to close our acquisition of a 50% interest in X-Elio a premier global solar developer in the fourth quarter, which will significantly enhance our solar development capabilities.

We also progressed construction of 150 megawatts of capacity, 960 megawatts of advanced-stage projects globally, including 16 megawatts of wind repowering projects in the United States.Finally, subsequent to the quarter-end, we invested an incremental $50 million into TerraForm Power as an investor and its recent $300 million equity issuance.

Following this issuance, our proportion of interest in TerraForm Power is largely unchanged, which for BEP is approximately 30%. TerraForm Power recently closed its acquisition of a 322 megawatt distributed generation portfolio in the U.S.

making it one of the largest owners and operators of distributed generation across the United States.I'll now turn the call over to Wyatt to discuss our operating results and financial position.

Wyatt?.

Wyatt Hartley

Thank you, Sachin, and good morning, everyone.During the third quarter, we generated FFO of $133 million, up from $105 million during the same period in the prior year. In the third quarter, our hydroelectric segment generated FFO of $125 million, up 20% relative to the same quarter in the prior year.

Our generation for the quarter was below the long-term average, driven largely by drier conditions in the U.S. northeast and Canada. Generation so far this year has exceeded the long-term average by 5%.

As we have stated for many years, we do not manage the business based on under or over-performance of generation relative to the long-term average and do not factor this into our planning.

Instead, we remain focused on diversifying the business from both a geographic and technology perspective, which mitigates the exposure to resource volatility and regional or market disruption.Additionally, we continued to advance initiatives to extract additional value from our hydroelectric portfolio.

For example, earlier this year, we qualified our 820 megawatts Sogamoso hydro facility in Columbia, which has 12 months of reservoir capacity to provide grid-stabilizing ancillary services, which is expected to add an incremental $3 million to our FFO on an annual basis.Our wind and solar segments generated a combined $72 million of FFO up 20% relative to the same period in the prior year.

We benefited from contributions from our operating and growth initiatives, including 210 megawatts of wind acquired in India, 51 megawatts of wind capacity commissioned and acquired last year in Ireland and significant cost savings realized from the implementation of TerraForm Power's new long-term service agreement for its North American wind fleet.Our storage and other segments generated $6 million of FFO during the quarter as our portfolio continues to provide critical grid-stabilizing ancillary services and backup capacity to increasingly intermittent grid.

For example in August, the U.K. experienced a major electricity disconnection event that resulted in a blackout affecting more than 1 million customers. Between 60 seconds to 4 minutes after the disconnection event, our first hydro portfolio, which represents 75% of the U.K.

storage capacity and has very fast ramp-up capabilities, provided more than half of the power used to restart the grid. We were the critical link to restarting the electricity grid in the U.K. on that day. We continue to work with all stakeholders to highlight the strategic importance of first hydro in the U.K. and Bear Swamp in the U.S.

and how the scale and speed of their response capabilities can be instrumental in managing the grid.Our liquidity position remains robust with $2.5 billion of total available liquidity.

During the quarter we continued to take advantage of the low interest-rate environment to execute on $2.3 billion of financing and approximately $210 million of capital recycling initiatives, raising a total of $320 million of incremental liquidity to BEP.

During the quarter we issued a CDD600 million investment-grade corporate green bond offering through which we completed the early refinancing of our 2020 corporate maturity. This issuance represents the largest corporate green bond ever issued in Canada and our fifth green bond issuance to date for total outstanding green bonds of almost $2 billion.

This bond was issued in 2 trenches, 10 and 30 years, which nearly doubled the average term of our corporate debt to over 10 years.We also advanced their capital recycling program, and subsequent at quarter end closed the sale of 2 mature European wind portfolios, as private investors continue to view high-quality, contractive renewable power assets as a proxy to government bond but with a higher yield.

The first sale was our 68-megawatt wind portfolio in Northern Ireland, which we developed between 2016 and 2018. The second sale was of our 123-megawatt wind portfolio in Portugal, which we acquired in 2015 and subsequently derisk by enhancing the capital structure and renegotiating the ONM contracts on better terms.

Together, these sales generated proceeds of $186 million or $74 million net to BEP and crystallized an 18% compounded annual returns since acquisition.Looking ahead, we continue to focus on executing our key priorities, including maintaining a robust balance sheet and access to diverse sources of capital, enhancing cash flows from our existing business and assessing acquisition opportunities.

As always, we remain focused on delivering to our unit holders long-term total returns at 12% to 15% on a per-unit basis. We thank you for your continued support. And we look forward to updating you on our progress in that regard. That concludes our formal remarks. Thank you for joining us this morning.

We'd be pleased to take your questions at this time.

Operator?.

Operator

[Operator Instructions] Our first question comes from a line of Sean Steuart with TD securities. Your line is now open..

Sean Steuart

Thanks. Good morning, everyone. Few questions.

The $14 million of incremental FFO tied to the ruling in Brazil reaffirming historical generation, can you give a little bit more detail on that item this quarter and I presume that sort of a one-off but any context you can give us there?.

Wyatt Hartley

That's right, Sean. Thanks for your question. So really what that relates to is in around the 2010 timeframe, there was a revision to how the assured energy in the MRE pool in Brazil was calculated that impacted a very small few of our small - it impacted the assured energy that was assessed on a small subset of our small hydro.

In 2015, there was a court-issued injunction which reversed that and brought us back to the assured energy that we would have historically always had and would have underwritten on but there was an appeals process going on from 2015 to 2019.

So we were providing - well, we were collecting cash on that additional energy we were providing against it just while that appeal was being dealt with.

We subsequently won that appeal in Q3, and so recorded all that revenue in the quarter but as you mentioned, it really is kind of a onetime but going forward we'll be recording our revenue on the higher energy base going forward..

Sachin Shah

Sean, maybe just to remind anyone who's listening. Most of our facilities in Brazil benefit from just a fixed volume of power that we sell. So it doesn't matter whether it's very rainy or dry, we can sell our power just under a standard amount of output. And a few years ago, the government challenged that. It's been a long-standing practice in Brazil.

And thankfully, the courts upheld the validity of that practice, which means that we will have that benefit going forward. It creates a really stable cash flow profile for the assets and we don't take any hydrology risk.

But to be conservative for the last few years, we were looking into our revenue at lower amount of earnings, not sure how the outcome would happen.

So now that we know we will be able to pick up the additional earnings, as Wyatt alluded to and all of our - virtually all of our assets in Brazil will benefit from this fixed volume ability to sell and therefore, we won't take hydrology risk..

Sean Steuart

Thanks for that detail. Sachin, just more detail on I guess the China 200 megawatts of wind you acquired there as well.

Background on that transaction, how it materialized and as you build your footprint in China, any context on the opportunity set for further M&A in that country going forward?.

Sachin Shah

Yes, sure. So if you look at our prepared remarks, I made the point of saying we're going to be careful in China, we're going to be measured. It's a great country to invest in. There's a strong support for renewables from a government perspective.

There's obviously a significant demand for renewable power, but just given the environment we're in, we need to be careful. And so we're taking what I'd say incremental steps to building a business there.

And the way you should think about it is we're both being measured on the amount of capital we put in to see the actual track from that was quite small. But more importantly, we are looking at assets that maybe are just not being looked at by the large SOEs who really are looking to deploy meaningful amounts of capital.

So we've carved out a little niche for ourselves. That niche is small transactions like the Envision deal that we just did, plus DG that we do on roof top. That typically has credit certainty from companies that are outside of China i.e. companies that are building manufacturing in the country. So that's our strategy.

And I think you shouldn't expect any drastic change in that. Will just be measured and build a small niche business in the country to keep our foot in the door and to be involved in one of the largest markets in the world..

Sean Steuart

Understood. I'll get back in the queue. Thanks, guys..

Operator

Our next question comes from Robert Hope with Scotiabank. Your line is now open..

Robert Hope

Morning, everyone. I want to first start off with BEPC. Just seeing that the exchange ratio is a little bit different than we're seeing for BEP, want to get a sense of what's driving the overall size of BEPC.

Is it tax considerations on your side or a view of potential demand on the market for a taxable product there?.

Wyatt Hartley

Thanks for your question, Rob. It's Wyatt here. What I would say is when we looked at the sizing of BEPC, of course, we wanted to do it on a tax-free basis in terms of that transaction and also, we want to make sure that the vehicle had the scale and the liquidity to attract investors.

And so for us, when we came up the sizing, we were very comfortable that the size we came up with one, we were able to do on a tax-free basis; and two, it gave the vehicle sufficient scale to really trade well and have sufficient liquidity. So it was really a balance of those two things.

It's a bit different than what the - as you referenced, the infrastructure, the sizing on theirs, but a lot of that was probably driven by that the tax nature - achieving the first aspect of being tax free, but for us, we're able to do a bit bigger and felt like as I mentioned that the liquidity - it gave us enhanced liquidity and it would make it attractive security for us going forward..

Sachin Shah

Also Rob, just remember Brookfield Asset Management owns 60% of that and owns 30% of BIP, our sister company.

So to Wyatt's point, for us to make sure there's enough liquidity in the stock, we had to factor that ownership interest in as well because what we don't want to do is have so few BEPC shares out there that they can't trade, there's no liquidity and therefore, people don't get the benefit of owning them.

And so part of our thinking was also to make sure there's enough liquidity in the system..

Robert Hope

All right, appreciate that. And then just move over to X-Elio.

Now that you've - the transaction was announced a couple of months ago should close in the relatively near-term, how are you thinking about the overall size of the development program there and how - what amount of megawatts do you think you can put into the market per year? And will that be a self-funding model there?.

Sachin Shah

So I'll start with the last one. Yes, we intended to be self-funding. For the most part, if you think about the company having an aggregate quantum of capacity in the range of 6,000 megawatts, think of it as almost 2,000 that's either operating or under construction, and then another 4,000 that they want to build out over the next 5 to 7 years.

And that's not to suggest all of that will get built out but that's the pipeline today. And our view would be that we would generally be selling operating assets that are either in existence today or that we complete through construction.

We can use the accretion there to then fund the follow on development, and therefore it should be a self-funding model. Obviously, if we find unique ways to grow the franchise, then we're going to put capital in because it's going to have a great return for our investors. And if we find projects that are of significant scale, we'll do that as well.

But based on the business that's there today, it should be largely self-funding.

In terms of how much they intend to build out per year, we're probably looking at around 500 megawatts per year of construction or completed projects on the low end and on the high end, our business case would have somewhere in the range of 800 megawatts.So it's going to be a fairly robust build program. But this is an excellent management team.

They have a long track record of building and developing solar projects and we intend to support them with our scale. And it's just a unique way to partner with a developer today that could benefit from scalability to procure more cost-effectively our access to capital and our global support network..

Robert Hope

All right, appreciate the answers. Thank you..

Operator

Our next question comes from Mark Jarvi with CIBC World Markets. Your line is now open..

Mark Jarvi

Thanks. Good morning, everyone. Maybe just on BEPC and just the structure.

Can you just remind us again assets held through which will be officially BEPC and if that limits any ability to as a result of those assets and which collection of assets might be held inside that?.

Wyatt Hartley

Mark, thanks for the question. It's Wyatt here. So effectively what BEPC will own will be our Permian assets and then the majority of our Brazilian assets.

In terms of how that impacts the business, we really think of it as very limited or no impact really because we will still control the vehicle out of BEP as well as we have significant lines in between the 2 vehicles around $2 billion so that we can manage working capital et cetera.

Plus, BEP will own the C class of BEPC's shares which effectively gives BEP the right to all the residual cash flows that are paid out through distribution to the BEPC unit holders. So in terms of how it impacts our operations, we really see it as really nothing.

But it does own the underlying Brazilian - majority of our Brazilian assets as well as all of our Colombian assets..

Mark Jarvi

And no impact on what you would view as higher priorities for asset recycling?.

Wyatt Hartley

No, it still would - our priorities as you know, on asset recycling is really trying to find those assets that have the highest value that we're going to be able to attract the highest valuation in the market compared to where we value it, and that in terms of this structure that really won't impact how we approach our asset recycling program..

Sachin Shah

And maybe just add. Over time, we can always change the mix of the assets in that portfolio. So to the extent that we want to recycle capital, we'll have that flexibility.

In the end, this is designed to be economically entirely equivalent to our BEP shares and therefore, we're not trying to impose any constraints on the vehicle that would then limit our ability to optimize it..

Mark Jarvi

Okay, good to know. And then while we're talking about asset recycling, obviously interest rates are low. We talked about a lot of the assets you guys have been selling or contracted.

As we go to more merchant assets and even when you think about the X-Elio pipeline and types of contracts, how do you guys think about the next sort of 5 to 10 years contract mix impacting what types of assets and the pricing you get on asset recycling?.

Sachin Shah

Sure, look if I was to say over the next decade, clearly, you've seen over the last decade contract pricing has come down. The merchant markets are largely ineffective today as a viable long-term place to sell power unless you have dispatchable assets.

We have that in our hydro business so I would say if you have hydro or gas or coal, if you're a traditional power producer and you have those base load technologies, then you're using the merchant market to sell. And in the end, our hydros have a tremendous advantage there because we don't incur fuel costs.

But if you're wind and solar, you really need to contract out the assets. They're not dispatchable, batteries are not economically viable and therefore, you either secure PPAs upfront or you have a long-term contracting strategy that reflects the marginal cost of those technologies. So I would say none of that should change over the long-term.

The only game-changer will be storage.

If you can couple renewables with storage, either from pump storage or from hydro or from batteries as they become economically viable, it just allows you to offer the market unique products and therefore the market could pay you a bit of a premium because getting that 24/7 or getting that load following or demand following renewable product is still something that we don't see in the market today.

So that is something that we see as an advantage of our portfolio to be able to offer that.And then obviously, from a rate environment perspective, just given the stable cash flows of wind and solar, if rates stay low for long, which we believe they will, then these assets will continue to be very valuable.

That being said, in the auction markets today, they're being bid up at a pre healthy multiple and therefore, I can't imagine that you'll see them continue to rise in value from here. They're already being bid up to mid-single-digit type returns.

And in that environment, we should sell assets on a select basis so that we can redeploy the capital on a cost-effective basis..

Mark Jarvi

Okay, thanks..

Operator

Our next question comes from Nelson Ng, RBC Capital Markets. Your line is now open..

Nelson Ng

Great, thanks. Just to follow up on China. You mentioned that you'll be targeting smaller assets.

Will that strategy primarily be based on just looking for bilateral agreements to buy assets or is it through a competitive sales process?.

Sachin Shah

Everything to date has been bilateral. I don't think we'd be that prescriptive about it, Nelson. I suspect, just given the nature of the transaction market there, you really do have to build a strong outreach program and engage in bilateral relationship building.

But like all markets around the world, as markets develop and evolve, companies seek to run options for their assets they believe will command a strong interest. And again, we would look at that. It doesn't mean it we'll be successful because that's generally not an area that we thrive in but we're not being that prescriptive..

Nelson Ng

Okay, got it. And then my next question relates to I think the reduction in some operating costs, drove some of the results this quarter. It looked like operating costs reduced by about $18 million.

I'm not sure whether you're able to kind of carve out how much of that cost reduction was due to cost savings versus other factors like FX or divested assets..

Wyatt Hartley

Nelson, what I would say is that amount that's produced in the current period, there's a mix of timing in there just around when those costs occurred during the year. There's a mix of FX. The peso had moved against us year-on-year.

But what I would say focused on the year, we had a view of we could achieve $10 to $15 million of savings over the full year. We were on track to achieve that for the year so I wouldn't really focus too much on the quarter.

It's really kind of as those cost savings come through the year and we're well on track to achieve that $10 million to $15 million on that basis..

Nelson Ng

Okay, perfect. Then just one last question.

In terms of the longer-term contracts in Colombia and Brazil, can you just give a bit more color in terms of how the current market environment is in terms of do you have to - how does the long-term price compared to the medium and short-term price?.

Sachin Shah

So first of all, remember, both Colombia and Brazil don't really have what I would describe as liquid and merchant wholesale markets. So therefore, you're either just a price taker in the short-term or you're building a bilateral contracting capability.

And therefore, if you look in both of those markets, our business is really about serving customers, developing relationships with them and then securing contracts anywhere from 1 or 2 to 3 to 5, to 8 to 12 depending on the underlying customers' needs.

And in Colombia, we've made it a point over the last few years to really pushing contract term out and talking about that on these calls about securing longer term contracts to get price stability.

I would say in both of the markets, what we generally find is that there is a consensus long-term view of power that really is not hinged on short-term volatility. And it's really around the cost of new build in those markets.

And to the extent that we can provide a slight discount to the cost of new build, then investors or sorry, commercial counterparties are willing to sign up to those longer term deals because it provides some stability in their cost structure.

So in Brazil today, I would argue that that long-term view of new bill is slightly higher than the current market sells for, but very equally, if it's a dry period, that short-term power price just spikes up well above the long-term power curve.And then the same thing in Colombia, if you're going through an El Nino and it's very wet then the power price gets depressed but in the long-term, people will still sign up to a more of a fundamental view.

And from our perspective, we're not trying to take short-term profits at the expense of long-term stability. So we will always prioritize long-term contracts over grabbing a few extra dollars in the short-term..

Nelson Ng

Okay, thanks for all the color, Sachin. Those are my questions..

Operator

Our next question comes from Rupert Merer with National Bank Financial. Your line is now open..

Rupert Merer

Good morning. So back to the 200-megawatt wind project in China.

Can you give us some color on the returns of the contract and who the uptake is with?.

Wyatt Hartley

Rupert, the details on that 200 megawatts, the project is located in Shanxi which is really the coal-producing province in that country. It's with the local discum [ph] which given the credit quality of that province and their fiscal position is high-quality counterparty, its long duration, it's almost upwards of 20 years.

So all the things that we look for when acquiring an asset of that nature..

Rupert Merer

Will that contract have inflation protection? Does it have any curtailment risks?.

Wyatt Hartley

The contract doesn't have inflation through it. In terms of curtailment, just given as you can imagine, given it's in the coal region of the country, the transmission build-out in that region is really strong, really significant. So there's very little impact on curtailment given the strength of transmission in that province..

Sachin Shah

I would just add. Throughout China there is always curtailment no different than we see in the U.S. especially as intermittent generation hits the grid. We underwrite curtailment in our view of value. We have a benefit of already having existing wind farms in the country and we've seen firsthand curtailment.

In fact, from our perspective, because curtailment in China is a little bit higher than what we've seen in the U.S, it acts as a little bit of a downside protection mechanism we underwrite to the current curtailment.

And then as the country reinforces its grid, as utilities build out the transmission, what we've seen is actually curtailment declines and it acts as additional value to our returns that we never paid for.

So we've seen that play out with the assets we bought in 2017 through TerraForm Global and we would expect the same here just given that the curtailment in China, as a market is higher than most parts of the world..

Rupert Merer

What would your typical financing strategy look like for projects in China? Are you going to be using project debt and this is the cost of the debt comparable to what you might see in other developing markets?.

Wyatt Hartley

Rupert, what I'd say is we definitely use project debt. That's our focus across any project or any project that we do, any financing we do. Same idea, long duration, fixed-rate debt, all of our core financing principles. In China, it is a bit of a different financing market. You can either deal with offshore banks or onshore.

In this specific case, we were able to secure financing on an onshore basis, largely on the back of the strength of the contract. With respect to these projects, specifically, in terms of the cost of debt, it's going to be a bit higher than what you see in developed markets.

I'd say it's around 100 to 200 basis points, but still kind of in that 5% to 6% range. So still a very accretive way to finance the project..

Rupert Merer

Great. That's all I have. Thanks for the color..

Operator

Our next question comes from Frederic Bastien with Raymond James. Your line is open..

Frederic Bastien

Thanks. Just wanted to close the loop on China. You took a 45% interest in the wind firm, which is larger than your normal pro-rata share.

Is there anything we can read into that?.

Sachin Shah

Frederic, I think the 45% is for the total amount of capital we deployed in the country, which is a mix of both the wind firm plus the small DG investments that we put in so it may be worded a little bit poorly, but we have a 50-50 JV on the rooftops and we put in 30% of the capital through our fund.

So the wind farm, we would have 30% and then we would have 50-50 on the rooftop. And the blended amount that we put in would be around 45%..

Frederic Bastien

Thanks. That's helpful.

You provided a good example of First Hydro's ability to provide a critical backup capacity, but your storage business is relatively small in the grand scheme of things so I was just wondering how do you grow or ensure that you maximize the value of that business on a go-forward basis?.

Sachin Shah

Well, look, pump storage by their nature are not - there's not a lot of them around the world.

And therefore, the ones that are there are quite valuable and we think will become more valuable over time just given wind and solar being adopted in major markets and the lack of development of battery technology at a pace that maybe we would have thought 3 or 4 years ago. And what happened in the U.K. is a great example.

It's a reminder to regulators of the fact that batteries alone cannot solve for those instances where you have significant outage events in markets. So I would say from our perspective, pump storage is a great asset class, if we could acquire more, we would.

And the other forms of storage we have in our business, which are also quite unique are our reservoir based hydro or our low capacity factor running the river hydro plants where you can modulate river flow.And again, those things are quite unique and because of that, if you look at the revenue profile of those types of assets, they're far more diverse than a simple wind or solar firm, where you can earn 4 or 5 different types of revenues.

You can earn energy, capacity, ancillary services, black star capability. There's a number of different things you get paid for. And we've made it a point for many years that we think because of that, the earnings quality of our business, which is not just tied to energy prices alone is very high..

Frederic Bastien

Thanks, Sachin. That's very helpful..

Operator

I'm showing no further questions in queue at this time. I'd like to turn the call back to Sachin Shah for closing remarks..

Sachin Shah

Okay, as always, thank you, everyone, for your support. We look forward to updating you at the end of the year with our full year 2019 results. Thank you..

Operator

Ladies and gentlemen, we've concluded today's conference call. Thank you for participating. You may now disconnect..

ALL TRANSCRIPTS
2024 Q-1
2023 Q-4 Q-3 Q-2 Q-1
2022 Q-4 Q-3 Q-2 Q-1
2021 Q-4 Q-3 Q-2 Q-1
2020 Q-4 Q-3 Q-2 Q-1
2019 Q-4 Q-3 Q-2 Q-1
2018 Q-4 Q-3 Q-2 Q-1
2017 Q-4 Q-3 Q-2 Q-1
2016 Q-4 Q-3 Q-2 Q-1
2015 Q-4 Q-3 Q-2 Q-1
2014 Q-4 Q-3 Q-2 Q-1