image
Technology - Semiconductors - NASDAQ - US
$ 5.79
-2.53 %
$ 167 M
Market Cap
-8.27
P/E
EARNINGS CALL TRANSCRIPT
EARNINGS CALL TRANSCRIPT 2022 - Q1
image
Mike Bishop

Hello, everyone, and welcome to Atomera’s First Quarter Fiscal Year 2022 Update Call. I’d like to remind everyone that this call and webinar are being recorded, and a replay will be available on Atomera’s IR website for one year. I’m Mike Bishop with the Company’s Investor Relations.

As in prior quarters, we are using Zoom, and we’ll follow a similar format with participants in a listen-only mode. We will open the call with prepared remarks from Scott Bibaud, Atomera’s President and CEO; and Frank Laurencio, Atomera’s CFO. Then, we will open the call to questions.

If you are joining by telephone, you may follow a slide presentation to accompany our remarks on the Events & Presentations section of our Investor Relations page on our website. Before we begin, I would like to remind everyone that during today’s call, we will make forward-looking statements.

These forward-looking statements, whether in prepared remarks or during the Q&A session, are subject to inherent risks and uncertainties.

These risks and uncertainties are detailed in the Risk Factors section of our filings with the Securities and Exchange Commission, specifically in the Company’s annual report on Form 10-K filed with the SEC on February 12 -- excuse me, February 15, 2022.

Except as otherwise required by federal securities laws, Atomera disclaims any obligation to update or make revisions to such forward-looking statements contained herein or elsewhere to reflect changes in expectations with regard to those events, conditions and circumstances.

Also, please note that during this call, we will be discussing non-GAAP financial measures as defined by SEC Regulation G. Reconciliations of these non-GAAP financial measures to the most directly comparable GAAP measures are included in today’s press release, which is posted on our website.

Now, I would like to turn the call over to our President and CEO, Scott Bibaud. Go ahead, Scott..

Scott Bibaud President, Chief Executive Officer & Director

Good afternoon, and welcome to Atomera’s first quarter 2022 update call. I’m sure you’ve noticed the momentum that’s been building over the course of this year, and I hope to share some details of that with you today.

Then, after providing some insight into latest industry trends and how they affect us, I’ll turn the call over to Frank to briefly review the numbers and outlook. As you recall, we entered into a joint development agreement in January of last year with a large market-leading semiconductor provider.

The goal of the agreement was to install MS capability in their fab and to work with their R&D team to validate MST’s performance benefits while simultaneously proving that it could meet their manufacturability requirements.

This opportunity arose because one of this customer’s business units had found MST’s capabilities compelling and subsequently referred us to their R&D arm, whose job it is to vet incoming technologies. This customer invested a lot including production tool resources, engineering time and money into the initiative.

And working together, we were able to install the MST technology in their fab. Two weeks ago, we were proud to announce that we had successfully met or exceeded all of the requirements of the JDA, resulting in two important outcomes. One is obviously the milestone payment from the customer, which are recognized as revenue in the first quarter.

But the more important step is the ability to work with the customer’s business units to eventual production. As you know, Atomera’s number one goal is to ship MST-based products, resulting in royalty payments.

A successful outcome to this JDA was necessary, so we can start moving those business units forward on MST integration and towards commercial royalty-bearing production.

Comparing the phases in this JDA with our standard business model is not appropriate, since BUs will have to go into integration before moving into qualification and later into production. We will continue to provide updates as best we can, but as our followers know, there’s a high degree of confidentiality demanded in this industry.

And this customer is especially sensitive. Further, as everything in this JDA has taken a bit longer than our initial expectations, we’re not guiding to a timeframe on these next steps.

However, since they completed the time-consuming epi installation process and will not have access -- I mean will not have to send wafers to Atomera for MST deposition, future integration process cycles should be shortened.

An hour ago Atomera announced that we entered into our second JDA, this time with a large semiconductor foundry who’s been working with us in phase 3 for a number of quarters.

After extensively reviewing our technology, our TCAD simulations, MST enabled wafers and the impact MST can have on their designs, this customer decided to enter into a joint development agreement with Atomera, the purpose of which is to define exactly what steps will be taken with high priority and with a full set of resources to take MST-based products into production, if the results of our latest experiments meet their expectations.

In our business, we expect each engagement to differ and therefore each JDA to have unique properties. So, I’d like to note that this JDA is different from our first in some important ways. First, it’s not being administered by a central R&D group, but by one specific technology area.

So, we believe this customer has the ability to move faster than our prior JDA partner on a first product. Second, this contract was structured to smooth the path towards productization after we pass the next milestone.

So, there’s no revenue associated with signing but the customer has committed to prioritize our wafers and dedicated team who can help move the process to production quickly, and it clearly spells out the revenue expectations coming in the later phases of the JDA.

That said, if we’re successful on this JDA, we believe the customer will move expeditiously towards commercialization because the all the legal and contract delays should be behind us. So, with these two JDAs underway, I’d like to take a step back and review where we are.

We have 19 customers and 25 engagements in our pipeline, of which we have 2 JDAs and 5 paid licenses. We’ve had one new customer move into phase 2, offset by another engagement that was consolidated as a customer combined two programs into one.

Two of our analysis customers are foundries which will help us make MST available to a wide set of fabulous companies targeting many different applications. This has been a goal of Atomera’s for the last year, and we’re making good progress in that direction.

Unfortunately, I can’t go into the exciting details of each engagement because we are working on some high-potential areas which can provide significant competitive advantage to our customers, making them especially sensitive to confidentiality.

I can say that we are getting very-promising results, which has led these customers to deeper engagement and hopefully to more JDAs on licenses. The pace of the activity in our facility has increased over the past six months. And our goal, as always, is to move each customer towards commercialization, as quickly as possible.

We believe the advancements in our JDA program will spur competitive pressures on all of those in our pipeline to move faster. Last quarter, our technology was recognized by some important third parties, which has resulted in several key marketing initiatives.

Towards the goal of moving customers faster, Atomera created MSTcad simulation software, which rides on top of Synopsys’ industry-leading Sentaurus TCAD tools. Last month, Synopsys hosted a joint webinar on how the MST tool set can be used to model MST’s optimized transistor performance.

Working together with Synopsys, we have already helped industry players gain a much better understanding of how MST can be integrated into their semiconductor manufacturing process. This webinar has directly led to several incoming inquiries about using MST in new customer designs.

Also, we submitted a paper showcasing the results of our MST-SP technology to a very prestigious IEEE power conference. The ISPSD conference is the premier international forum for technical discussions on all aspects of power devices. Although thousands of papers were submitted, ours was one of only a few selected for the conference in May.

There is no doubt that our submission will expand interest in MST-SP, with the key players in the power semiconductor industry, who we know will attend this important conference in May.

Our work on RF-SOI technology, which is critically important to 5G cellular continues to consume a lot of our time and resources because of its great commercial potential. We hope this area will be one of the earliest to adopt MST and to bring it to production, considering the significant improvements we can bring to designs.

Likewise, we continue to believe our technology has excellent potential in memory and for advanced nodes. Now, I’d like to address some recent developments in the semiconductor industry, which I believe create an exceptionally favorable environment for Atomera.

Although the big headlines tend to focus on how TSMC, Samsung and Intel are competing to bring the 3-nanometer or 2-nanometer nodes to market, the industry has recently been recognizing the importance of the legacy nodes and in particular fabs running 200-millimeter wafers.

Given the chip supply shortfalls, it seems obvious that the industry needs to add capacity in this area, and 200-millimeter fab capacity is forecast to grow 21% to mitigate the supply imbalance. But there are a few problems.

First, the vast majority of 200-millimeter lines have been operating in fully depreciated fabs, which can be very attractive financially when operated near capacity limits. Building new fabs is very expensive and 200-millimeter equipment, which has had very limited production over the last decade is in short supply and is priced at a premium.

This situation will place substantial margin pressure on these companies for many years, until they can defray the very-expensive build costs. So, these new fabs can’t easily get equipment, and when they can, the associated CapEx costs will drive lower profitability than they’ve experienced in the past.

MST can help solve these problems for both the fab owners and their fabless customers by allowing them to shrink die and thus boost throughput with only a minor increase in tool costs. 200-millimeter epi tools are available and MST will allow operators to continue utilizing their depreciated fabs with the associated good economics.

Foundry capacity is forecast to stay tight, while industry-wide CapEx is forecast to grow by 24% in 2022, primarily in 300-millimeter wafer fabs. To deal with the capacity crunch and pay for the CapEx, fabs are raising prices on their wafers up to 20% now, and industry insiders say that price rises are not transitory, they’re permanent.

In this situation, as fabless semiconductor makers will tell you, the need to get more die per wafer is imperative. MST provides a path to get to these improvements that is both, easily implementable, and at a more reasonable price than most other alternatives.

Atomera’s spreading this message to industry players, and we believe that it will lead to widespread adoption over time. We remain laser-focused on getting the first player into production, who we believe will drive the domino effect that’s been predicted for some time.

As I said in the past, we believe industry conditions have reached a point where both, near and long-term structural changes will provide exceptional opportunities for Atomera.

In our Q4 call, I said that we were entering into 2022 with strong momentum, and I think you will agree that it is continued with a new licensee, successful execution on our first JDA, and the opening of a new JDA. On the technical development side, we also continue to make good progress, as recognized by important third parties in the industry.

We still do have more JDAs and licenses in our pipeline, which I believe will help illustrate our gathering momentum as we move through the year. Now, Frank will review our financials..

Frank Laurencio

Thank you, Scott. At the close of the market today, we issued a press release announcing our results for the first quarter of 2022. This slide shows our summary financials.

Our GAAP net loss for the three months ended March 31, 2022 was $4.1 million or $0.18 per share, compared to a net loss of $3.6 million or $0.16 per share in the first quarter of 2021. In Q4 2021, GAAP net loss was $4.2 million or $0.18 per share. Revenue in Q1 2022 was $375,000 compared to $400,000 in Q1 2021.

We did not recognize any revenue in Q4 last year. GAAP operating expenses in Q1 2022 were $4.3 million compared to $4 million in Q1 2021 and $4.1 million in Q4. Non-GAAP net loss for the first quarter of 2022 was $3.3 million compared to losses of $2.9 million in Q1 2021 and $3.4 million in Q4 2021.

Non-GAAP operating expense last quarter was $3.6 million, compared to $3.4 million in Q4 and $3.3 million in Q1 2021. The $400,000 of revenue that we recognized in Q1 of last year had a 100% gross margin, since it consisted solely of the grant of a manufacturing license to our first JDA customer.

In Q1 2022, our $375,000 of revenue consisted of a JDA success fee, which involved Atomera engineering costs and the integration license revenue, which included costs of MST deposition and wafer delivery. Our cash balance at March 31, 2022 was $24.5 million, compared to $28.7 million at the end of 2021, a decline of $4.2 million during the quarter.

As we’ve discussed on previous earnings calls, our cash usage is typically highest in the first quarter of each year, due to annual payments, which are expensed throughout the year on our income statement. As of March 31, we had 23.4 million shares outstanding.

Scott mentioned in his remarks that we’ve signed a new JDA, which we believe will lead to us recognizing license and engineering services revenue, and more importantly, will accelerate our path to commercialization with this foundry partner.

We are not yet in a position to predict the timing of when we may reach these revenue-generating milestones under the JDA. And consistent with our past practice, I’m not guiding revenue beyond the current quarter. So, our guide for Q2 revenue is zero.

On our last quarterly update call in February, my guidance for non-GAAP operating expense for 2022 was range of $15.25 million to $15.75 million. Although, we are slightly behind our hiring targets, we remain focused on adding engineering headcount, and we are not changing our previously stated guidance.

With that, I’ll turn the call back over to Scott for a few summary remarks before we open up to questions.

Scott?.

Scott Bibaud President, Chief Executive Officer & Director

Thanks, Frank. As you’ve heard in this call, we continue to gather steam here Atomera and are quite excited about some of our near-term developments as well as the underlying macro environment, which is creating favorable long-term conditions for MST to be widely adopted across more and more applications.

As we work with more customers and unveil new capabilities of our technology, our TAM is constantly expanding. We believe our recent successes are only the beginning of momentum, which will continue throughout the year, and will establish Atomera as a technology licensing leader in the semiconductor industry.

I truly look forward to sharing those successes with you in the future. Mike, we can now take questions..

A - Mike Bishop

Thank you, Scott. [Operator Instructions] And right now our first question comes from Richard Shannon of Craig-Hallum. .

Richard Shannon

Thanks Mike. And Scott, thanks for getting me on here. Congratulations on your JDA announcement today. I think my first couple of questions are on that topic. I guess, Scott, first question here is, I’d like you to describe this a little bit better.

You described how this is a little bit different than the first JDA that’s going through central engineering versus the new one that’s going through a business unit. Maybe you could help us describe how this moves faster to the first product here than in the other way.

Is it just simply because it’s not going through the central engineering pipeline, or is there some other reason for that?.

Scott Bibaud President, Chief Executive Officer & Director

Yes. So, one of the -- generally, when we engage with a customer, we’re engaging with one specific business unit that’s thinking they have a problem, and they want to use MST to solve it. And they’ll implement that and they’ll take it to production. It’s a fairly focused effort. That’s how this current JDA customer is.

Our JDA that we announced last year, we initially started working with the customer like that, one of the business units looked at our technology, said, hey, this looks very interesting.

But in that very large company, they have a policy that no new technology can be brought in by a business unit, has to be vetted by the central engineering group before other people can use it. So, went to the central engineering group.

Now, the good news about that is from that first JDA, the central engineering group did a lot of work and now they’ve kind of given it their seal of approval for the rest of the company. And those business units can now adopt it and move very quickly to production.

But going from the beginning of the JDA to getting into production is probably a little longer because the central engineering group had done this work. Now, the good news is they’re ready to go to production, or they could possibly go to production quickly with a number of different business units.

This new JDA we announced today is pretty focused around one specific business. And if all goes well, they’ll be driving that specific one to get into production, and hopefully, will get adopted by other business units inside their company..

Richard Shannon

And to that last comment there, Scott, I was -- that was my follow on question, the potential here? And do you have any engagement or potential engagement with other business units? Or if this company also has central engineering with them as well?.

Scott Bibaud President, Chief Executive Officer & Director

Yes. As a matter of fact, we’ve been working -- I mentioned in my remarks, we’ve been working with this company in phase 3 for a while they’ve tried a number of different things with our technology, and they’ve decided to focus on this one area first.

But we do have a number of other areas that we have been talking with them about and has the real potential to expand beyond, into those once we’ve established success in this first area..

Richard Shannon

Okay. Is there any characterization you can give for this second JDA? You described it as a major semiconductor foundry? Any other -- any other ways you can describe them, location, technology focus, anything? I suspect not, but just wanted to see if there’s anything else you can characterize..

Scott Bibaud President, Chief Executive Officer & Director

Yes. I can tell you that we did ask and try to say a lot more than we did and kind of negotiated for that. But ultimately, they weren’t very comfortable with it. And they may be more comfortable when we get to the later stages of licensing. But, we’ll see. .

Richard Shannon

Okay. Well, we’ll look forward to that day. Maybe jumping over to the first JDA here. Obviously, great to see the next steps down there and the money coming in the door. Just want to get some -- your best characterization and visibility into how long the next steps are going to take. I know it’s not immediate, it’s going to take a few quarters.

I don’t know, maybe you can describe what your expectations are now.

And is there any limitations with this customer in terms of getting wafer runs and doing the analysis on them? Obviously, with very tight capacity, or do you think that’s -- that won’t be a limitation for you?.

Scott Bibaud President, Chief Executive Officer & Director

I think, right now, I wouldn’t say that getting wafers is the limitation. Where we stand right now is we’ve kind of -- we’ve had the central engineering group say, hey, this is good technology, it does what they say it does. So, that meets the performance requirements.

And we also have tested it and determined that we can take it into high volume production, because that’s one of the things they’re testing for. But now, we have to convince individual business units that they want -- that they should use it, and then go through a process of integration with them. And we’re just at the very beginning of those stages.

Ideally, we’ll be able to convince a number of different business units. But I can’t give much insight into that now. It’s just too early stages to know. I will say one more thing is that, we installed MST in the factory at that first JDA customer. And because of that, if a new business unit wants to try our technology, they can do it really quickly.

They can literally take wafers off their line and put them into this other machine that’s in the same factory, get MST on there and test it in the same day, as opposed to what normal customers. They have to take their wafers, package them up, send them over to us, we do a lot of contamination checks, a lot of setup.

It takes a lot -- takes about a month to go through that whole processing, and then incoming inspection in their site again. But for this first JDA customer, literally in one day, they can do it, should speed up everything to be able to get for its production quicker..

Richard Shannon

Scott, you’ve said a couple times in this call and obviously in past calls as well, it’s your priority to get the first customer across the finish line, get into phase 6 and get to wafers out the door in a production sense here. I’m not sure if this is the right way to ask the question to that end here.

But the best way I thought to answer this, please change if necessary.

But do you think we’re going to get a customer moving to phase 5 this year? And is that the right way to describe the process by which the JDA or probably the first JDA customer announced? Is that the right way to ask that question, ultimately getting to the answer that we think is all -- will obviously be great news for Atomera’s wafers in production?.

Scott Bibaud President, Chief Executive Officer & Director

Yes. I’m not going to predict anybody, we’ll get to Phase 5 right now. Is it possible? Yes. For the JDA customer, they’d have to go through some integration work. So, just at a high level, let’s think about it like they’re developing a product. And their essential engineering group has said, hey, this is a good ingredient for your product.

But before they would start taking it to production, obviously, they’re going to insert the ingredient and run a bunch of tests and make sure it works well. And it doesn’t cause any errors and all those other things. Once you’re done with that, they’ll start going towards the process of entering it into production. Phase 5 is entering into production.

So, there still has to be some work on that integration effort. And we can’t -- I don’t like to call them phase numbers in this case, because it isn’t really linear, but let’s just say they have to do integration phase work, and then they can get into the qualification Phase 5 work, after that.

But as I said, again, the integration work can go pretty quickly, if they use their internal tool..

Richard Shannon

Scott, you made an interesting set of comments regarding 200-millimeter capacity out there. And I think a couple of different technology areas was -- my understanding is, they’re focused, mostly, if not entirely on that capacity.

Once you’ve talked about before being RF-SOI, I think a good -- a decent chunk of industry capacity on 5 volt analog is also there.

Is this tight capacity -- is that creating any headwinds for actually adopting, because it’s so tight they can’t even do the work to implement your technology, even though there is seemingly a lot of benefit there, or is that actually accelerating it and -- let me just stop at that point..

Scott Bibaud President, Chief Executive Officer & Director

Yes. No, I think, I would say at this time last year, I would say there are quite a few headwinds, very -- big trouble getting some access to fabs and everything. This year, even though I don’t see -- the industry is not seeing signs that the capacity crunch is behind us, it’s certainly still going out.

I think people are saying, at least at the end of the year. We are seeing more interest and willingness to run R&D wafers, because, it’s just been some time that they’ve been prioritizing production and now they got to get back onto the R&D bandwagon to keep their innovation going.

So, I don’t see it as a major holdup for us this time -- at this time, getting into those 200-millimeter fabs..

Richard Shannon

Okay. I’m sure I’ll follow up on that topic offline. There seems a very interesting dynamic there. One last question for me, and I’ll jump out of the line. I know there’s a bunch of other questions here.

Just kind of big picture long-term, one of the six product -- or technology areas you’ve talked about on last call and well before that, one of them was talking about advanced nodes here, which is a big topic of discussion across the semi-industry here.

Any commentary on engagement there? And specifically, I guess, my key question here is, are you -- do you expect to be able to intersecting only at node introductions or major variations of those introductions, or we possibly intersect at old nodes that are getting a refresh in some manner?.

Scott Bibaud President, Chief Executive Officer & Director

Yes. I don’t know the exact answer to that question, Richard. But, I will tell you that we’ve had customers that have talked to us about yield enhancement on existing nodes that are in production, we have still advanced nodes, but doing work there.

We also are talking to someone about something that would come out in the next generation, the leading edge. And I also want to say that when we talk about advanced nodes internally, we also kind of throw the memory guys into that category.

Even though memory tends to be a little bit bigger line with, they’re still pushing the envelope on how they’re building wafers and are looking for solution. And so, yes, I think we have a number of opportunities, both for new process nodes coming out and ideally to enhance some existing ones..

Mike Bishop

Our next question comes from Cody Acree of The Benchmark Company..

Cody Acree

Great. Thanks guys. I appreciate you taking my questions and echo my congratulations on the new JDA.

Can you walk us through, Scott, your expectations on how we think about license fees coming in from this JDA? Is it -- given the foundry situation and that you’re not going through something like central research or central development, is there a different timing schedule that you would expect or is the first JDA signed a model to follow?.

Scott Bibaud President, Chief Executive Officer & Director

I don’t think the first JDA signed is a model. By the way, Cody, good to hear from you. And let me just say, I don’t think that the first JDA is a model. I actually think most of our JDAs are a little bit one-off kind of unique, each one of them. This particular JDA, as I mentioned, we don’t have revenue at the signing.

But later on down the line, we do have these milestones defined. Now, the first milestone requires us to get good results on some work that we’re doing together right now. But, the whole point of the JDA is to kind of grease the skids, that if we get good results on that next one -- and we’re very confident.

Then, they know what licenses have to be executed, when, how much they cost. And they also have committed to dedicate a certain amount of engineering resources and high-priority production runs and other things. And the reason why we’re doing this is because we’re dedicating a lot of effort to it.

And we don’t want things to be slowed down by contractual negotiations, or any kind of misunderstandings between the team. We wanted to make absolutely sure they know. If we’re going to make this super high priority, then this is what we expect from you. And so, we’ve got this now signed and in place. And it’s, I think, a really good step for us..

Cody Acree

Excellent.

So, as you look at the breadth of the engagement, what are the deliverables that you have committed to? And is it a matter of a single wafer run, so we were talking months, or are there larger developments at hand?.

Scott Bibaud President, Chief Executive Officer & Director

I got to be careful here not to give too many details. But I would say, based on the results of one or more wafer runs that have been defined. But one thing about our technology and any new process development technology in semiconductors, it’s very rare that you kind of do the first one and it’s a homerun. You got to -- it’s an iterative process.

So, there is contemplation of that, in this agreement. And we’re looking for a signal that indicates that with a little bit more tweaking, we’re going to get to the promised land that we’re all hoping to get to. So, yes, there’s a few runs and there is a number of, I’d say, a few shots on goal here before we know.

And if the first run proves spectacular, then the milestones will be hit earlier. And if we have to do another one, it will take a little bit longer..

Cody Acree

And how broad is the engagement with the foundry, across processes or customer?.

Scott Bibaud President, Chief Executive Officer & Director

This first one is focused -- pretty focused on a specific product area specific process. But as I mentioned, we have spoken to a number of other organizations inside this company. And with -- if we get good results on one, I think we’ll see -- have the ability to expand into a number of other businesses..

Cody Acree

So, you are getting access to a larger customer base, or do you think it’s just different processes within the foundry?.

Scott Bibaud President, Chief Executive Officer & Director

Yes, different processes within the foundry, which would be focused on different applications and so forth..

Cody Acree

Okay. So, what is the interaction with the foundry customers? The evaluation….

Scott Bibaud President, Chief Executive Officer & Director

Oh! The foundry customers? Yes. So far, it’s been limited. We’re increasing our outreach to fabless customers all the time and starting to talk to them. As a matter of fact, we have one fabless licensee. And so, that’s something that we’re building up as a capability. And it is one exciting thing about working with foundries.

When you go to a fabless customer, I would say, in most cases they’re quite interested and their next question is, where can I try running some wafers on this? And so, it’s important to be able to have a foundry that you’re working with that you can point them towards that you can make that definitive next step..

Cody Acree

Okay.

But your interaction with the wafer customer through your foundry, you said has been limited today?.

Scott Bibaud President, Chief Executive Officer & Director

Yes..

Cody Acree

So, there’s no, as part of the JDA, an evaluation by the customer, the foundry customer, so that you can move to potential license volume, license fee?.

Scott Bibaud President, Chief Executive Officer & Director

Yes. Actually -- so although the interaction with the end customer will be very interesting and helpful for us, the foundry owns the process. They’re going to define all of the performance parameters of the process. They go out and sell that process to their end customers.

So, if we can meet all the requirements of the foundry process, then we’ll be able to get rollout to customers. Now, if we were able to go out and engage with those customers directly, obviously, you always learn a little bit more by going to the primary source. But it’s not absolutely mandatory for us to be successful in this one..

Cody Acree

Scott, can you talk about progress with some of your early licensees?.

Scott Bibaud President, Chief Executive Officer & Director

Sure. Yes. All of our licensees with one exception, continued to work with us continue to move forward towards getting technology into production. We’ve talked a lot about one of them today, was the existing JDA, I mean, our first JDA customer. We had another licensee that started in February, and obviously, we’re going very hot and heavy with them.

One of our licensees, AKM, who allowed us to use their name, we’re still on quite limited work with them, because their fab burnt down, they’re using third-party fabs right now as they figure out how to rebuild and get started again on their R&D work.

But we have been talking with them and do have an assurance that when they get their stuff back together, they’ll be restarting their work on MST. But our other licensees, we continue to have great relationships and an interaction. Hopefully, we’ll be moving forward to production with them..

Cody Acree

So, you would expect that STMicro is moving forward?.

Scott Bibaud President, Chief Executive Officer & Director

Yes..

Cody Acree

If you had to handicap one of your current engagements to volume, revenue. I know Richard asked timing of this year.

But whether it’s timing this year or next, which do you think gets there first?.

Scott Bibaud President, Chief Executive Officer & Director

Yes. It’s a little bit hard to guess, actually. I would say, we have more than one licensee and our JDA partner that could be first..

Cody Acree

Okay.

What’s going on in China? Are there any implications to your engagements?.

Scott Bibaud President, Chief Executive Officer & Director

No ramifications for our engagement right now. In China, we didn’t have -- although we had started to do some work in China with talking to fabs over there, a couple of years ago, we slowed down that effort based on some concerns about IP and other things.

And so, today, although the environment is very volatile over there, it’s not really affecting us in any way..

Cody Acree

Okay.

And, Frank, you mentioned your OpEx, that you’ve got open racks that you’re trying to fill, what’s the process there and what are your expectations of getting that OpEx spent?.

Frank Laurencio

Yes. I mean, as I’ve been saying for a couple of quarters, we feel like we’re reaching some limits on our capacity with the number of customers that we’re working with. And we could do more with more engineers. So, that’s where our hiring is focused and adding more engineering headcount. It’s not -- Q4 is a difficult time to hire.

And we’ve really been trying to ramp up our efforts to bring on more staff. But, the reason that I haven’t sort of made any change on our expense guidance, we think there’s plenty of work for folks to do. And we’re actively hiring there. So, we’re -- we’ve not added any new headcount during Q1, which we would have liked to do.

But our plan all along was to see these headcount more kind of loaded toward sort of second, third, fourth quarter, just kind of easier to get people in the pipeline in that timeframe. But, as you know, it’s a very-competitive environment right now to hire. So, it just takes a real concerted effort to get it done.

So, yes, that would probably be the single factor, I think that could cause us to maybe under spend versus what our guidance is, if we’re not able to hire, but we’re holding the line on that..

Cody Acree

And I guess, what is the process of hiring talent that suited your needs?.

Frank Laurencio

Some of our best hiring recently just came through word of mouth and network effects of the folks that are already here.

There’s -- we’ve got an epi team in the Phoenix Arizona area, which is kind of a center of excellence for that that’s where the historically been a lot of fabs and there are also -- have been a lot of -- there have been some significant sites there for both, ASM and applied.

And so, there are alumni from those OEMs as well as some of the companies that have had fabs. They’re like Intel and onsemi and Motorola that are sort of fertile places to hire. We’ve done some recruiting out of universities as well.

But yes, I’d say, the two places we’ve found the most folks is some with technical recruiters and some just with kind of a network effects from our own team. And I think the latter is really the most successful.

But, in this market, we’ve got to also take some rifle shot approaches, and we’ll kind of pursue both ways, I mean, with jobs posted on our site with recruiters and word of mouth, I think pretty typical for the way most engineering organizations would try to grow..

Cody Acree

And lastly, Scott, would you agree with Frank’s comment that you’re kind of maxing out your ability to respond to customers?.

Scott Bibaud President, Chief Executive Officer & Director

Yes. There’s no doubt that we could use -- we could use a number of additional people. I think our opportunities are bigger than our ability to service them right now, which is -- and to correct that it’s not going to be another 20 people. It’s only a small group of people, but we really need to do that..

Mike Bishop

Thank you, Cody. And Scott and Frank, we have a number of questions coming in from today’s attendees on the Q&A window. So, I will just go ahead and ask some of the some of the relevant ones.

So, the first one that comes across is comparison from the second JDA we’ve just announced to the first one is, do you think the timeline with the foundry JDA will follow the same timeline as the first JDA or will it be faster?.

Scott Bibaud President, Chief Executive Officer & Director

Yes. I don’t think it will follow the same timeline as the first JDA. The first JDA, honestly, let’s go back and look. We announced that we were in the negotiation phase.

And it ultimately took almost a full year before we can finally announce the start of the JDA, and then took us another year to get to the point where we would -- we had done all -- met all their technical specifications. I personally think that was pretty slow, and we should be doing better than that with other customers.

So, I’m hopeful that this next JDA will move faster..

Mike Bishop

All right. And then, for the second JDA, there’s just some clarification.

The question is, could you state that the royalty rates were already negotiated, if MST is successful in the next step?.

Scott Bibaud President, Chief Executive Officer & Director

That’s a great question and I have heard a number of kind of questions coming in from investors about that. I want to -- so when we negotiate licenses with people, we negotiate kind of our standard upfront licenses. And we tell them about the range in which we expect to be getting royalties when they are in production.

We have had that discussion with a lot of customers, the amount we’re asking for with royalties is reasonable. It’s lower than some other technologies that we know of that have been licensed into the semiconductor industry. And the range should work for most companies.

That being said, almost everyone doesn’t want to negotiate the license rate until they can see the final benefit that they’re going to get on their production.

So, if we can bring them a massive savings, for example, on the amount of die that they can get per wafer, maybe they can get 30% more die per wafer, and it increases their gross margin by 10%. Obviously, they’re going to be willing to give us more royalty than if we can bring them only a very modest improvement.

So, they all want to wait until later in the process before we finalize the royalty rates, and that’s true. So summarized, we have not negotiated final royalty rates with anyone yet, but we have socialized them with many people. And we think the levels that we’re asking for are fair and entirely justifiable..

Mike Bishop

All right.

And would we expect a phase 4 integration license with the foundry that just you just announced the JDA with?.

Scott Bibaud President, Chief Executive Officer & Director

We can’t answer the when question because, as we mentioned, it’s hard to predict. But, we can say that the JDA does include provisions for a manufacturing license, which would involve installation, at some point in the future when we met some milestones..

Mike Bishop

All right.

And going back to the first JDA, can you comment on any specific business units with the first JDA and the timeline of moving them to phase 5?.

Scott Bibaud President, Chief Executive Officer & Director

Yes. Unfortunately, I just really can’t talk about any potential to use or what the timeframes would be. The timeframes, I can’t answer even if I knew to be used, because it’s too early in the process. But I think, I said in my remarks, that customer in particular is hypersensitive to confidentiality.

They will be listening to this call and will be checking to see what I’m saying. And so, I can’t really reveal any details about what they’d be doing with the technology..

Mike Bishop

And maybe to Frank, we got a question about getting more color on the $75,000 integration license..

Frank Laurencio

Yes. No, I mean, I would just say that’s from the license that we announced in the first quarter, and it’s in the range of license fees that we’ve been paid for integration licenses in the past. And so, we’ll look forward to continuing successful wafer runs with that integration licensee with the hope to get that to phase 4..

Mike Bishop

Okay. Scott, I think that concludes the questions that I’ve got prepared. You may go ahead with the closing comments..

Scott Bibaud President, Chief Executive Officer & Director

All right. Well, I want to say thank you to everyone who’s attended today’s presentation. It was great to be able to share with you some information on our recent successes and give you a feeling of the enthusiasm we’re experiencing inside Atomera.

Please continue to look for our news articles and blog posts to keep you up to date on our progress, which are available along with investor alerts on our website atomera.com.

We look forward to seeing some of you during our scheduled marketing activities, including the Craig-Hallum Institutional Investor, Oppenheimer Emerging Growth and the Stifel Cross Sector Insight conferences coming up later this quarter. Should you have additional questions, please contact Mike Bishop. We’ll be happy to follow-up.

Thanks again for your support. And we look forward to our next update call..

Mike Bishop

Thank you, everyone. And this concludes today’s call..

ALL TRANSCRIPTS
2024 Q-3 Q-2 Q-1
2023 Q-4 Q-3 Q-2 Q-1
2022 Q-4 Q-3 Q-2 Q-1
2021 Q-4 Q-3 Q-2 Q-1
2020 Q-4 Q-3 Q-2 Q-1
2019 Q-4 Q-3 Q-2 Q-1
2018 Q-4 Q-3 Q-2 Q-1