Thank you, Craig, and good morning, everyone. Thank you for joining us today. Whether you followed Excelerate Energy for many years or you are new to the story, I want to start by grounding us in who we are and what differentiates our business. At Excelerate, we operate a global LNG and power infrastructure platform. We help countries enhance their energy security by increasing access to global LNG markets. We do this by providing safe and reliable downstream energy infrastructure, particularly in markets where traditional onshore development is impractical or would take too long to deploy. Our business is built around critical assets, long-term contracts and dependable operating performance. That foundation has allowed us to operate through market cycles and deliver consistent results. Turning to 2025. It was a strong year of execution for Excelerate Energy. For the full year, we delivered record adjusted EBITDA of $449 million. This is an increase of about $100 million over the prior year. That performance reflects the contribution from the Jamaica acquisition, continued growth in our other LNG, gas and power activities, along with reduced year-over-year operating expenses. Operationally, we performed exceptionally well. Enterprise-wide reliability exceeded 99.9% for the year, our strongest performance to date. And remember, reliability isn't just an operational measure, it's a financial one. Consistent, reliable performance generates stable, predictable cash flow. We also ended the year with a strong balance sheet, significant liquidity and low leverage. That financial position allows us to enter 2026 from a position of strength. Today, we are introducing full year 2026 adjusted EBITDA guidance of $515 million to $545 million. At the midpoint, this is over an $80 million increase over our full year 2025 results. Our '26 outlook is grounded in assets and contracts that are already operating or moving through execution. This provides a solid and visible foundation for the year ahead. Looking more broadly, global LNG supply is going to increase materially through the end of the decade. As that supply comes to market, we expect demand for LNG regasification infrastructure to grow, particularly across the global South. Many of these markets are seeking reliable, scalable solutions to enhance energy security and reduce dependence on dirtier fuels. At the same time, power demand continues to rise. Population growth, industrial development and expanding digital infrastructure, including AI data centers are placing new demands on energy systems. These dynamics reinforce the need for reliable LNG and power infrastructure, and they align well with the capabilities of our asset portfolio. Turning to Iraq. This remains a strategically important project for Excelerate. For Iraq, the project is mission-critical. It provides a reliable source of nat gas to help with an existing deficit to support growing power generation needs and strengthen the country's energy security by reducing exposure to regional supply disruptions. Construction of Hull 3407, our newest best-in-class FSRU is progressing well. The vessel has completed sea trials and is advancing through final commissioning activities. These include gas trials and cryogenic testing ahead of delivery in early second quarter. In parallel, site mobilization and early construction activities for the integrated LNG import terminal at the Port [ of Vlorë ] are underway. Engineering and procurement activities are progressing. Long lead items have been ordered, and we have executed the lease for the existing Jetty. As the project has advanced into detailed engineering, we refined the structural design of the jetty to ensure it can support safe long-term terminal operations. These refinements required additional scope, including structural reinforcement, which has resulted in higher estimated construction capital. As the project moves forward, we are gaining better visibility and are refining our financial assumptions based on scope and commercial terms. Total estimated capital cost for the Iraq terminal is now expected to range between $520 million and $550 million, inclusive of the cost of the FSRU. The all-in cost of the vessel remains roughly $370 million with about $220 million remaining to be paid for the vessel in the second quarter of this year. From an economic perspective, while total CapEx estimates have increased, we are now expecting annual terminal operating costs to be considerably lower. The Iraq project is expected to achieve an EBITDA build multiple of approximately 5x. This is in line with the economics we outlined on our November earnings call at the minimum contracted offtake of 250 million standard cubic feet per day. Under the contract, deliveries can scale up to 500 million standard cubic feet per day, providing meaningful upside potential. The integrated Iraq terminal remains on track to commence operations in the third quarter of '26. Now I'll turn to Jamaica. In '25, our Jamaica LNG to power platform performed exceptionally well. It delivered safe and reliable energy supply to the country and provided us with stable contracted cash flows. It also demonstrated exceptional resilience during Hurricane Melissa, one of the all-time most powerful hurricanes with minimal operational and financial impacts during the fourth quarter. Hurricane Melissa highlighted the benefits of LNG and floating regasification infrastructure and bolstering the energy security of Jamaica and potentially for other islands throughout the Caribbean. Following the acquisition, our focus has been on integration, operational excellence and maintaining high levels of reliability. We are proud to announce that full integration of the Jamaica platform was completed successfully in Q4. With the integration complete, we are advancing our strategy to optimize the Jamaica platform while pursuing new infrastructure opportunities across the Caribbean. With Jamaica integration complete and the Iraq project progressing as planned, our focus now turns to executing the next set of defined initiatives to extend our earnings growth trajectory. First, we expect the Express FSRU to be redelivered at the expiration of its current contract late in Q3. We have high confidence in redeploying the asset and improved economic terms over the prior contract. This should support incremental EBITDA uplift in 2027. Second, we are moving forward with plans for an FSRU conversion. Under our current planning assumptions, the converted FSRU will be available for commercial deployment in early 2028. Negotiations of the final contracts related to the conversion are ongoing, which is why this project is not yet included in our committed growth capital guidance. We're going to provide more detail once the necessary commercial agreements are finalized. Finally, future growth will be driven by a set of scalable LNG regasification solutions that we know how to execute. These include integrated onshore terminals, floating storage units paired with onshore regasification and small-scale and modular configurations. Together, these solutions provide a disciplined and repeatable way to deploy capital and scale our global asset portfolio. With that, I'll turn the call over to Dana to walk through the financial results in more detail.