Thanks, Joe, and good morning. The third quarter marked a decisive inspection point in our operational recovery and capacity expansion. We saw substantial improvement in production throughput at both the Tulsa and Longview facilities, which drove meaningful sequential sales growth, while continued strength in bookings contributed to further backlog growth. While margins in the quarter continued to be impacted by operational inefficiencies in Longview and the early ramp-up of the new Memphis facility, we continue to make steady progress and expect sequential margin improvement to continue through the fourth quarter and into early 2026, putting us firmly on track toward our longer-term goals. The BASX brand continues to perform exceptionally well, fueled by strong momentum in the data center market, where favorably priced bookings have risen sharply and the pipeline of opportunities remains robust. BASX-branded backlog grew to $896.8 million, up 119.5% from a year ago and up 43.9% from the prior quarter. Demand for both our air-side and liquid cooling products remain strong, reflecting how well our custom solutions align with customer needs. To meet this growing demand, we remain laser-focused on ramping up production capacity at our new Memphis facility. This facility adds nearly 800,000 square feet of state-of-the-art manufacturing capacity which provides considerable growth to our BASX production capabilities and positions us well for continued growth. The ramp-up of the facility is progressing as planned, with large-scale production expected by year-end. With a strong backlog and significant increase in capacity, we expect the BASX brand to deliver meaningful growth in 2026. The AAON brand continues to perform well, with sales rising substantially from the prior quarter and bookings remaining strong. AAON-branded sales grew 28.1% sequentially, driven by over 20% production increases at both the Tulsa and Longview facilities and improved utilization of the ERP system, enabling us to better meet demand. Also production returned to prior year levels. In Longview, while still about 20% below last year showed strong progress. Based on September and October exit rates, we expect Longview is nearing full recovery. Enhanced production output of AAON-branded equipment resulted in a book-to-bill ratio for the brand below 1, successfully helping bring backlog in lead times of AAON-branded equipment closer to normalized levels. While backlog for the brand remains higher than desired, we are making steady progress in reducing it. We are committed to achieving this in the near term, ensuring we can effectively serve our customers and restore a normal business cadence. Despite a soft commercial HVAC market and extended lead times, AAON-branded bookings remained strong. While flat year-over-year due to a challenging comparison, bookings were up 15% on a 2-year stack reflecting continued strength in underlying demand. National account wins were particularly robust with bookings up 96% in the third quarter and 92% year-to-date, representing 35% of total bookings for the year. Bookings of Alpha Class air-source heat pump equipment also continued their strong momentum, up 45% quarter-over-quarter and 46% year-to-date. As I mentioned earlier, Longview's ERP implementation has progressed considerably. While production of AAON-branded equipment at the facility remained about 20% below target, output improved sequentially throughout the quarter and by quarter end, production of AAON-branded equipment was approaching full recovery. Production of the new BASX-branded equipment in Longview has performed exceptionally well with consistent year-to-date improvement. Despite the improvement in throughput, we continue to work through efficiency challenges that are weighing on facility profitability. We view these as temporary and expect meaningful margin improvement in the coming quarters. In Tulsa, average production levels for the quarter reflected a full recovery. And by quarter end, we're running ahead of target. We've made strong progress in improving coil supply, which supported the higher production volumes. And while our supply of coils remains constrained, we are effectively managing through these constraints. With the Longview implementation now well underway, we have gained valuable experience and insight, both operational and technical that will guide future ERP rollouts and greatly enhance our readiness to efficiently deploy the ERP system across our other facilities. While we continue to expect some level of operational impact as future sites transition, we are far better prepared to manage these challenges with strengthened internal processes, improved training programs, and a proven framework that positions us to execute future implementations with greater speed, precision and minimal disruption. We've applied the lessons learned from Longview to the Memphis go-live, which occurred on November 1. And we continue to expect Redmond to transition in the first half of 2026 with Tulsa following in the second half. I will now turn the call over to Rebecca, who will walk through the financials in more detail.