image
Industrials - Engineering & Construction - NYSE - US
$ 95.61
-0.136 %
$ 4.18 B
Market Cap
40.86
P/E
EARNINGS CALL TRANSCRIPT
EARNINGS CALL TRANSCRIPT 2018 - Q4
image
Operator

Good day, and welcome to the Granite Construction Fourth Quarter 2018 Earnings Conference Call. Today's conference is being recorded. After today’s presentation, there will be an opportunity to ask questions. [Operator Instructions] I would now like to turn the conference over to Mr. Ron Botoff. Please go ahead..

Ron Botoff

Welcome to the Granite Construction Incorporated fourth quarter and fiscal year 2018 earnings conference call. I am very pleased to be here today with President and Chief Executive Officer, Jim Roberts; and Senior Vice President and Chief Financial Officer, Jigisha Desai. We begin today with an overview of the company's safe harbor language.

Some of the discussion today may include forward-looking statements. These forward-looking statements are estimates reflecting the best judgment of senior management and reflect our current expectations regarding future events, occurrences, circumstances, activities, performance, outcomes and results.

Actual results could differ materially from the statements made today. Please refer to Granite's most recent 10-K and 10-Q filings for a more complete description of risk factors that could affect these projections and assumptions.

The company assumes no obligation to update forward-looking statements whether as a result of new information, future events or otherwise. In October 2018, the company filed an 8-K, which provides a quarterly and annual look back in mapping our reportable end-market focused segments.

Our fourth quarter and fiscal year 2017 and 2018 results reflect this report. Certain non-GAAP measures may be discussed during today's call and from time-to-time by the company's executives. These include, but are not limited to adjusted EBITDA, adjusted EBITDA margin, adjusted net income, adjusted earnings per share and backlog.

Please note that as applicable these metrics exclude non-recurring acquisition related expenses and one-time integration costs associated with the acquisition and integration of Layne Christensen Company and LiquiForce.

Reconciliation of certain non-GAAP measures are included as part of our earnings press releases, as well as in company presentations, all of which are available on our investor relations website, investor.graniteconstruction.com. Thank you.

Now, I would like to turn the call over to Granite Construction Incorporated, President and Chief Executive Officer, Jim Roberts..

Jim Roberts

Thank you, Ron, and good morning, everyone. Thank you for joining us to discuss Granite's 2018 performance and our outlook. 2018 was a significant year of growth and evolution for Granite, and today we are extremely well-positioned to execute the next phase of our strategic plan.

About this time last year, we took a major step forward with the announcement of Layne Christensen acquisition. This acquisition highlighted our end-market focused path for growth and diversification.

And with the subsequent completion of LiquiForce acquisition, our integrated growth strategy for the water rehabilitation market gained even more traction. By completing these strategic acquisitions, we expanded our sound platform for growth that drives Granite's diverse portfolio as America's infrastructure company.

2018 proved to be a year of significant evolution for a company that is nearly a century old. Granite teams proved that they were up for the challenge and successfully integrated our new acquisitions, and proudly share our core values as we united these new businesses into our portfolio.

We congratulate our legacy operations for record 2018 safety performance. Our strong safety culture was enthusiastically introduced to and welcomed by our newly acquired businesses.

The day we continue to align our new teams with Granite's nine core values, defining expectations and prioritizing safe work strategies, to ensure all Granite employees return home safely every single day. We continually strive to reach zero incidents in any given year and we are rapidly nearing our zero goal.

Certainly, we are cognizant of the macroeconomic data points that have created global economic growth concerns. But the green shoots across the end markets in which we operate continue to point a steady growth for Granite on healthy public and private market demands.

As recently noted, current market conditions remain the best we have seen in more than a decade. Before I'll hand the call to Jigisha, I want to spend a few minutes providing a high-level view of our 2018 results and our strategic outlook.

As we saw throughout much of 2018 operational and financial trends held up until wet weather began impacting our business in late November. Notably after mild weather allowed for a particularly strong fourth quarter in 2017 winter rains came much earlier this year.

The erratic wet weather for the last six weeks of the year slowed much of our business in the West. Similar to early 2017, Mother Nature's influences carry forward into the first couple of months of 2019, slowing the start of work on our historically high backlog and rapidly accelerating committed materials volumes.

We will continue to emphasize bidding discipline and the critical earnings leverage it creates. Given with the late-season weathers slow down across much of the West revenue, profitability and earnings improved significantly in 2018 and we expect 2019 to be another year of significant top and bottom line expansion.

Despite the late year negative weather impact, revenue increased 11% in 2018, reflecting the balance of new acquisitions, strong demand environment and a critical focus on improved profitability. The profit performance of our acquired businesses beat our expectations generating solid incremental margin contribution.

Overall in 2018, Granite achieved a nearly 24% company gross profit increase, 144 basis points of adjusted EBITDA margin improvement and 49% adjusted net income growth from the previous year. Granite strategy plan to concentrate on end markets for growth and diversification is alive and well.

Diversification is also a critical driver of recent success and opportunity. Our results illustrate the benefits of four areas of focus strategic themes that we have discussed for quite some time.

First, diversifying the sources and drivers of our revenue funding; second, emphasizing new, but related end-market growth opportunities; third, diversifying our customer base with private market focus; and fourth, derisking our project portfolio with increased pricing, higher revenue velocity work and lower risk projects with generally short durations.

As we march into 2019, we will continue to focus on these areas to drive improved results in growth across Granite's broad footprint. We are actively engaged in enacting our strategic plan. We are reviewing potential bolt-on targets as well as more transformative opportunities for geographic expansion of Granite's vertically integrated model.

And we also are continuing to explore diverse targets to grow our end-market focused segments. Granite strategy plan is built upon our belief that a diversified end-market focus is the most appropriate way to balance growth and risk opportunities for our business.

And we're particularly pleased that this intentional portfolio shift already is producing results and uncovering future opportunities. Importantly, recent project procurements are decidedly positive with our procurement strategy and backlog composition becoming more aligned with our strategic plan.

Recent Construction Manager/General Contractor or CM/GC wins in California and Utah add to a growing roster of best value projects on which we have focused our procurement efforts, emphasizing balanced risk and consistent returns in our transportation segment and across the company.

This new CM/GC negotiated work aligns perfectly with Granite's footprint and with our capabilities. This procurement method allows Granite to win a project based purely on its qualifications and a value we add to the project delivery process.

We expect to pursue more than $4 billion in CM/GC type negotiated work in 2019 across the nation including nearly $1 billion in California alone. This work provides critical new balance to our transportation segment portfolio as we work to complete and mitigate the impact of three legacy unconsolidated joint venture projects.

Two of these three mega projects are nearly complete. We only have one challenge legacy project below 90% complete today and we remain steadfast in proactively limiting risk and improving performance wherever possible.

The bidding environment in Granite's water and specialty segments also were healthy, supported by steady public and private market demand. The environment is expected to allow teams to continue to build backlog, pointing to meaningful segment growth in 2019.

We are focused on winning work that we are well-positioned to efficiently execute, targeting local, regional, national, and international opportunities including work and operations in Guam, Canada, and Mexico.

With those moving parts in mind, our core legacy operations, especially our vertically-integrated construction and construction materials operations continue to plan for growth and to raise the bar on execution of profitability in what we view as a healthy growth environment for the foreseeable future.

We took strategic actions last year that drove results in 2018, but more importantly, position Granite for success in 2019 and well beyond.

Increased bidding discipline and an emphasis on alternative procurement negotiated work within our healthy and growing segments of transportation, water, and specialty have provided a backlog of improved margins coupled with lower associated risk.

The activity level across end markets and geographies remains buoyant and supportive of our top and bottom-line growth expectations.

Today, our bookings and project pursuits reflect an intentional strategic shift in end-market diversification, portfolio derisking, and portfolio mix with improved returns tied to a better balance of project duration, pricing, location, project burn, and procurement types considerations.

With our emphasis on disciplined pricing and profitability, our win rates have declined modestly as anticipated. But we are winning considerably more work and our project revenue and profit outlook continues to improve. Granite is extremely well-positioned to continue flourish and to grow, delivering on our vision as America's infrastructure company.

And with that, I hand it over Jigisha with details on our results and our 2018 outlook.

Jigisha?.

Jigisha Desai

low teens consolidated revenue growth and adjusted EBITDA margin of 8.5% to 9.5%. Now before we take your questions, let me turn the call back to Jim..

Jim Roberts

Thank you very much Jigisha. As a note, that the guidance that Jigisha just provided anticipates a second consecutive year of better than 30% improved operating performance, as we see strong growth opportunities both in top and bottom line performance for 2019.

Growth opportunities for the year around the horizon are now at our doorsteps across the end markets and geographies that we serve. Defeat of the proposition 6 ballot measure in last November’s California election mark an improvement point in infrastructure investment.

This was something of an inflection point for public spending, beginning to spur significant growth opportunities in our Transportation segment.

Preservation of the 10-year $52.4 billion Senate Bill 1 The Road Repair and Accountability Act of 2017 better known as SB 1 funds critical repairs maintenance and improvement of California's transportation system, providing improved safety and quality of life across the state.

Notably SB 1 is just one of more than two dozen state and local transportation and infrastructure measures passed since 2015 across the country, including Utah, Washington State, California, Illinois and Indiana with these public spending commitments serving as significant resources for Granite's growth and profitability for years to come.

It's worth noting that SB 1 more than $5 million of incremental annual funding does not sunset. We anticipate significant stepped-up funding in 2019. Measure M in Los Angeles along with other local measures passed in California 2016 now are providing at least $3.5 billion in incremental annual infrastructure investment at the local level.

The Sound Transit measure in Washington State is another $50 billion long-term infrastructure program for the Puget Sound area. And Sound Transit program is incremental to their state 16-year, $16 billion connecting Washington transportation plan passed in 2015 and funded primarily by gas tax increase.

Our procurement strategy is taking hold, as we continue to emphasize pricing discipline in a market that we believe is full of pent-up demand, as we continue to build backlog across the company. Strong demand trends also are evidence of growth opportunities for our growing Water segment.

Water segment backlog increased significantly in 2018 and a bidding environment remains healthy against the backdrop of steadily improving state and local water infrastructure funding. We do not see the dynamics of this robust market slowing down for Granite in the foreseeable future.

At the federal level, programs such as America’s Water Infrastructure Act and state revolving fund for clean water and drinking water are in place; but today they only provide a framework. Now funding must expand significantly to meet the seemingly endless demand that ace crumbling infrastructure provides.

It may surprise some, but our optimism is growing that our country is poised to invest significantly in domestic infrastructure.

At the state and local levels, funding trends are improving and now we are increasingly optimistic that infrastructure investment is an opportunity for elusive political agreement that will produce significant incremental and long-term funding solutions.

Discussions in conjecture point to infrastructure as the most logical area of agreement in Washington in 2019. We anticipate that a deal will be struck.

Our growth outlook for 2019 does not include a federal infrastructure bill, which if passed immediately would enhance long-term stability in the overall market while adding two additional growth prospects beginning as early as late 2020. Our teams are prepared for a strong recovery and we expect this solid demand will accelerate activity in 2019.

This year's outlook includes the impact of current winter weather, which along with strong backlog has created a springboard for strong growth when weather finally subsides.

As American infrastructure company Granite is extremely well positioned to be opportunistic even while emphasizing discipline of what we view as early to mid cycle growth end markets. This balance will produce top and bottom-line growth in 2019 and will beyond, delivering exceptional value for our key stakeholders.

And with that everyone, we'll be happy to take your questions..

Operator

Thank you. We will now begin the question-and-answer session. [Operator Instructions] We will take our first question from Alex Rygiel, B. Riley FBR. Please go ahead..

Alex Rygiel

Thank you, and good morning, everyone..

Jim Roberts

Good morning, Alex..

Alex Rygiel

Jigisha or Jim, when do you expect the last project that's below 90% complete to be finished?.

Jim Roberts

That project will probably take two to three more years..

Alex Rygiel

Okay.

And then could you possibly quantify the fourth quarter adjustments from all of the legacy projects?.

Jim Roberts

Well, I don't have just the legacy projects. I will tell you this that the large projects themselves, the bottom line performance have largely improved from Q3 to Q4. As we have stated, the impact is starting to be reduced on a quarter-to-quarter basis.

And so, therefore, as the transportation segment produces results going forward, we're looking at it getting better and better over the next several years as these projects start reducing its size..

Alex Rygiel

Yeah.

And is there any way to quantify the impact from weather across your business either revenue basis or impact to EBITDA?.

Jim Roberts

Yeah, that's an interesting one Alex. That's certainly depends on what it could have been and we’re in the best situation, if we had no weather impact for the last six weeks versus by being impacted.

If substantial, we talked about somewhere on the bottom line, it could have been even $0.15, $0.20 a share at the end of the day on the bottom line adjustment. And it could have been more or less, depending on the weather in general.

If it's dry all the way through Christmas, we tend to just keep moving along and it could be substantially different than what it was..

Alex Rygiel

And lastly in your third initiative, could you expand upon the opportunities and what you're looking at as the private sector?.

Jim Roberts

Well, okay. So the private sector, we've built up a lot of activity in the commercial and industrial sectors. We really never found a lot of rebound in the residential sector. So from a private market demand, we've highlighted a lot of high-tech companies that we are working directly with all over the western U.S. today.

On the industrial side, we're working on the rail side with the major rail companies. We're working into the refining businesses. So both of those sectors are quite healthy and we have quite a nice backlog going into 2019 in both of those areas..

Alex Rygiel

Very helpful. Thank you very much..

Jim Roberts

Thanks, Alex..

Operator

We will take our next question from Michael Dudas from Vertical Research. Please go ahead..

Michael Dudas

Good morning, gentlemen, and Jigisha..

Jigisha Desai

Hey, good morning..

Jim Roberts

Good morning, Mike..

Ron Botoff

Good morning, Mike..

Michael Dudas

Jim, let me share some thoughts on backlog.

Year end 2018 in your backlog segments, how does the current in backlog margins look relative to what you had ending 2017 and 2016? And maybe how you look at Layne and LiquiForce relative to due diligence back in 2016, 2017 to where they are with potentials going forward? And on that, how much are we going to see -- it sounds like an shorter duration more booking burn type business, where we see that as we move into the knee part of the revenues and the business activities move to this middle part of the year.

And is that across the board in the segments or just primarily in the transport side?.

Jim Roberts

Okay, Mike. I'm going to flow down there on three different areas.

And if I missed something, please just me remind me, okay?.

Michael Dudas

Thank you..

Jim Roberts

Relative to backlog, the backlog, there is no doubt Mike that the backlog is healthier than it was in 2017 and 2016. That's getting better and better. Certainly, by burning off some of the large project issues that we've had, we're having a smaller portion of the backlog in those projects automatically makes it better.

But adding to that as we've increased our margin expectation certainly on the work that we procured over the last 12 months, that margin has increased. And adding the Water segment and as you can tell from the results stated in the release Water segment continues to operate at higher gross margin than any other segments.

So our backlog that we have today is with a much healthier margin than in previous recent years. So I hope that answers that question. Layne and LiquiForce are absolutely progressing as planned very well. I'm going to let Jigisha talk a little bit about the integration.

But I will tell you out in the field, Mike, from an earnings perspective, I can tell you how excited I am. I look at the lining business and you'll see we had a press release yesterday, we're getting not only main line work. We're getting lateral work. We're bidding work all over the country.

On the Mineral Services side, the mining, precious metal pricing has stayed stable, and we're seeing quite a nice backlog of work in the mining area. And then in the drilling business that goes up and down and the industrial municipality environments are strong on the drilling side.

So I think you're going to see Layne and we call it now Water and Mineral Services in Granite that's going to be a very healthy environment on margins. And then maybe Jigisha, you can add a little bit about the integration..

Jigisha Desai

Yes. I think the integration of both companies is going extremely well. Lot of the -- some of the short-term issues related to personal and all had been addressed in 2018. And then we're really focus now on integrating the kind of the back office system integrations. And we expect that majority of that will be done by the second quarter of 2019.

We are reinvesting in the business. It was somewhat capital charge and we definitely reinvesting in the business. And as Jim pointed out, the gross profit -- the profile with they do a lot of small jobs, so it's a quick burn type of work. So from a portfolio diversification, it's a really been a positive contribution to….

Jim Roberts

Yes. The margins are actually helping the overall margin of the company..

Jigisha Desai

Exactly. Yes..

Jim Roberts

And so there are many things that we're working on Mike that we noted a little bit in the script was that we are starting to work hard on SG&A..

Jigisha Desai

Yes..

Jim Roberts

Which is probably that is the one area that will move fast the middle of the year, as we continue to migrate the way that we manage our businesses from an SG&A perspective into the Water segment and the Specialty segment of WMS. But overall, I'm just really happy. We beat expectations going into the year and we're excited about where it's going.

Now, the last thing you mentioned was the project burn. So, smaller work, quicker burn that is one of the things I've mentioned over the last three or four quarters, Mike, that has basically lowered the overall backlog.

Although, I will say obviously we had a nice fourth quarter and where we have a very healthy backlog despite the fact that the smaller work doesn't necessarily show up in backlog as it gets burned so fast.

So, what you'll see coming out of the gate here in the spring, and hopefully soon, will be that we will be hitting it hard on a lot of our local water, smaller burn work, and the attempt there would be to ramp-up faster than we have historically on the revenue side because of the fact that this shorter duration.

We literally calculate revenue per day, margin per day on these jobs; try to optimize a quicker burn and higher margins on per day basis. So, we should come out of the gate pretty strong..

Michael Dudas

That's very helpful. My follow-up Jim is two-fold.

One, with all the expected SB 1 revenues funding projects local, state, counties wanting to spend the money, how California and other local and officials able to like kind of get through these projects, get the bids out, is there going to be issues with that over the next coming years? Are the states prepared to get the work that's required? And then and on top of that any implications or thoughts relative to high-speed rail cancellation that was just announced and any direct impact or indirect impact because of that towards the California civil construction market? Thank you..

Jim Roberts

Sure, let me go high-speed rail first and let me get into -- then we'll talk about the broader procurement strategy I would say of the state and local entities. High-speed rail is something that as you may know we have not been a participant directly in high-speed rail.

We've been the very first product out about four, five years ago when we were not close on it, went far below our number and so we stayed away from high-speed rail.

Now, with that said, most of the major general contractors that are building high-speed rail are not people that we compete with on a day-to-day basis in the transportation segment in the State of California. So, I don't see whether or not high-speed rail gets canceled, or slowed down, delayed.

First of all, I anticipate contracts that are underway will be completed and therefore those contractors -- or most of them are from -- I think there's one that's an in-state contractor that doesn't really follow in the transportation segment and all the rest of them are somewhat international or out-of-state contractors.

I think what you're going to see is they're going to pack their bags and go somewhere else where they can go do some large design build work if the high-speed will slows down. So, I don't see it having an impact on Granite at all. I don't see the competitors in the transportation segment changing their strategy.

They really have not been strong part of high-speed rail to-date. So, we'll see what happens politically. Whether or not California refunds money or they build the next phase or not, I think that's all you have left to conjecture at this point. Now, back to the overall state lettings, Mike, it's really good point.

There was a lot of concern originally when SB 1 hit the street that the State of California could not design the work fast enough to put on the street. And as we know most of the design work done in the State of California is done by the Professional Engineers Group of the State of California. They do their own in-house designs.

So with that said, what they did was they targeted maintenance work first so which is really good for Granite. So they took a big chunk of the monies that were -- that they would be employing in 2018, 2019 and maybe even 2020 to start upgrading the maintenance which is the large asphalt overlays, the concrete work, the rehabilitation jobs.

While their design folks could get design on large capital projects underway and completed. So with that in mind at the state level, I think you're going to see more maintenance work out bidding in 2019 which we already are seen by the way. And slight widening and overlays and things of that nature while they do the big design work.

At the local level, interestingly enough they have a pent-up demand for a lot of these improvement products for many years. And what they do is, they go to the external market to do their design work. So they will be able to move a little faster to get their capital improvement projects out on the street.

We've never seen a problem at the local level, when they pass a local measure of them getting the money out in the street within the next six to nine months. They've always figured out way to do that. They're already doing that as well. So I don't see the local money is being an issue at all.

And then I see there will be maybe a little delay capital projects which will be offset by maintenance projects at the state level..

Michael Dudas

You were very helpful. Thank you very much..

Jigisha Desai

You’re welcome..

Operator

We will take our next question from Steven Ramsey from Thompson Research Group. Please go ahead..

Brian Biros

This is actually Brian Biros on for Steven. Thank you for taking my question..

Jim Roberts

Hey Brian..

Brian Biros

I wanted to ask about SB 1 funding in fiscal year 2019. I believe it's one of the first full year for the funding.

I think you provided some color on how soon you think those dollars will actually slow into lettings and any color on type of projects that might come from those would be helpful?.

Jim Roberts

Okay. First of all that, this fiscal year it's ramped up to well over $4 billion where last year it was $2.5 billion. So first of all, there's a significant ramp up in the SB 1 monies in 2018, 2019 fiscal year compared to the 2017, 2018 year.

And interestingly enough Brian as I mentioned to Mike a few minutes ago, the work is hitting the street – it hit the street pretty nicely in January and now in February.

We saw somewhat of a delay up until the Prop 6 vote on November 6 last year and then after that, little slowdown during the holidays with everybody knowing that work was going to hit the street. And what is happening is as I explained is maintenance projects. And these are projects that use Granite materials.

So it's the asphalts, the concretes, it's the widening and it's the work that the State of California can show that they are spending the moneys -- the gas tax monies in a proficient manner and they're getting the work on the street now. January and February were both very nice bidding months for the State of California.

I don't see it slowing down at all as we move into the spring months and into the summer. I will say this. I think as we end 2019 you're going to see more of the capital improvement projects starting to hit the street; the big intersections, the interchanges some of the larger work.

The other thing that's happening is that, they are obligating monies into some of their CM/GC projects which is a certainly nice alternative as I mentioned and Jigisha mentioned earlier. And we've been quite successful on those as we've stated. And so, they are allocating money to the CM/GC jobs.

And the way the CM/GC jobs work is that, we were in a process today of negotiating some of that work with the State of California. We've been selected to build and it will come out task orders. So if it's a $100 million job, they might come out $30 million task orders.

It will probably be built in the same kind of burn, as you might expect $100 million job that will be awarded in $30 million $40 million task orders. That's happening already as well. So those CM/GC jobs will start burning here by mid-year, let's say, and then the maintenance work is bidding today.

And you'll see the capital improvement projects probably starting in a strong sense and I'm going to just rollout the end of the year knowing that engineering and design work has to be completed..

Brian Biros

Thank you. Good color. A quick follow up. I guess, regionally, in the past I believe you talked about strength coming out of the Southeast.

If you can share any specific states you're seeing increased work there? And specifically the type of projects in the states that are kind of driving the strength?.

Jim Roberts

Yeah. I mean the Southeast, as we mentioned, it's always been a strong corridor. We've seen Florida, North Carolina, Georgia really have healthy transportation programs as they go forward. We're in that market in a little different program than we are in the West.

Obviously, we are in bidding larger projects, in the $100 million plus projects in those states. But all three of those states and then, as we said, for quite some time now, we believe the Southeast, including South Carolina and some of the other adjacent states, will produce long-term benefits and higher transportation programs.

But today, Florida, North Carolina and Georgia are three of the strongest states of the Southeast..

Brian Biros

Great. Thank you..

Jim Roberts

Thank you..

Operator

We will take our next question from Bill Newby from D.A. Davidson. Please go ahead..

Bill Newby

Good morning, guys and thanks for taking my questions..

Jim Roberts

Sure, Bill..

Jigisha Desai

Sure..

Ron Botoff

Good morning, Bill..

Bill Newby

Just a couple of loose ends on the problem projects.

I guess, on the two that are over 90% complete, when do you -- when are you expecting completely hand those off and I guess what exactly is left to do and how are you thinking about the risk associated with what you have left?.

Jim Roberts

Yes. Good question, Bill. So when we get to this point, really what you're doing is, you're kind of closing out the jobs and selling them to the owners. We have a little bit of work to do on both jobs, not much. And most of that work should be completed in the first six months of 2019.

And then, we're in a process that we call a punch list process, where we literally go through items that the owner asked us to complete before we hand them the keys, so to speak.

Now in most of these larger projects, we've already handed them the keys in a lot of respects, where they were -- they are now operating and required to maintain sections of the roads and the environments that are already open.

So work will probably go on, let's say, from the middle of the year, but the key after that will be to really focus on dispute settlement. In both of these two jobs, we have some significant disputes with the owners. And even as we hand the keys and physically move away from the job, it will take some time to settle the outstanding disputes.

And that will be the lingering event that will hang on with those two projects for a while. We are very comfortable that we will end up in an environment that is in line with our anticipated recovery. But the physical work is short-lived, I'd say, six months..

Bill Newby

Okay.

And I guess that dispute settlement progress, I guess, it's -- expect that to, I guess, get started in the second half of this year and then time line, who knows?.

Jim Roberts

Well it's interesting Bill. It's already started. So in a lot of these larger I call these mega jobs there are somewhat ongoing disputes.

But how you build the jobs, how you end up on the job, a lot of times we pull that all into a major discussion at the end and come up with what we call a global settlement or will pick and choose certain issues and try to settle them outside of the global issue.

So in both of these cases the disputes have already been really worked on from both sides and we're really just dialing in to what will not be settled by the time we physically leave the job and that's the amount that may take -- could take years. I hope it doesn't. And so we'll see.

But in a lot of cases a lot of the disputes are being resolved as we move along..

Bill Newby

Okay. That's helpful. And then I guess on the last one that's going to drag on for a bit here.

Is there any way you could give us I guess a little bit of guidance on what's expected from that project in 2019? Do you look at the guide for 2019? Is that project going to be less than 5% of revs, less than 10%, is there any guidance you can give us there?.

Jim Roberts

Well certainly, it's less than 10% and less than 5% of our revenue. I mean, it's not a big overall part of the company. But it's all -- it's baked into the guidance. I mean, our anticipated revenue and earnings from that one job is incorporated into the guidance that Jigisha provided to you in both the script and we provided in the press release.

So whether we progress a little faster or a little slower, do a little bit or a little worse, it's inside of that of the revenue and EBITDA guidance already provided..

Bill Newby

Okay. Very helpful. Thanks guys. Appreciate it..

Jim Roberts

Thank you very much..

Operator

We will take over the next question from Jerry Revich from Goldman Sachs. Please go ahead..

Ben Burud

Hi, good morning everyone. This is Ben Burud on for Jerry..

Jim Roberts

Good morning..

Jigisha Desai

Good morning, Ben..

Ben Burud

Good morning. So your sales guidance implies an acceleration to mid single-digit organic growth from a mid single-digit year-over-year decline in the back half of last year.

Can you talk about what the drivers are of the acceleration in 2019 and what do you expect the growth came in so called?.

Jim Roberts

Okay, so I think you're in the ballpark relative to where we expect organic and acquisition growth to come from. And I think the key ingredient to and I'm going to focus on organic growth for a minute, really comes from the type of that we're bidding.

Remember, where we're looking at quicker burn work and so we anticipate type of work that we're bidding will accelerate as soon as Mother Nature allows as we said and it will burn faster generating revenue in a shorter period of time.

So that's why we see the organic growth ramping up nicely into the mid-single digits and we'll call it mid-single for the moment.

Now on the acquisition side, that again -- that's a really nice story there because that will get full year of that business and we've already done some integration work -- significant integration work in the first half of -- the second half of 2018 and we anticipate that to really ramp up nicely.

As we gain traction with Granite been able to help as Jigisha said, add to the CapEx which means we can build more crews and we can provide more equipment to expand that business. That will be a little slower. We are in the hiring mode right now, both in the organic and in the acquisition side of the business.

In the operations portion of our business, we are hiring people across the country to be able to facilitate the growth that we expect. So, both environments, the acquisition and organic are in a nice healthy growth environment today..

Ben Burud

Got it.

And to get to the 8.5, 9.5 adjusted EBITDA margin guidance in 2019 from seven-ish percent in 2018, it looks like that's essentially the large construction losses rolling up, is it as simple as that, or do you have other moving pieces we should keep in mind?.

Jim Roberts

Well, certainly that's part of it. But there’s a bunch of moving parts here. And let me elaborate a little bit. So first of all certainly we would expect growth in all of the markets, transportation in general.

You roll off some of the large project issues, but you also expand your market on your smaller burn work, because of the health of the economic environment that we work in, in the west, I'd say for construction. So we see that part ramping up nicely.

On the water segment, we do see that contributing to EBITDA margin by having a full year of higher margin work on our books. And the materials segment, we're still ramping up the margins on the materials segment. We ended up at spot this year that is not where we want to be. It is gaining traction.

We lost a quarter or part of a quarter due to weather but the materials business is getting stronger too.

As we do burn work and burn work more efficiently, we wouldn't be incorporating our materials into the type of work that we're bidding and that will not only help our construction segment and our overall revenue, it will help our material segment as well.

So I don't think it's just large projects slowing down with those couple projects, I think it's the health of the rest of the business that will really driving the growth for and the bottom line growth for 2019..

Ben Burud

Got it. Thank you..

Jim Roberts

Okay. Thank you..

Operator

Thank you. [Operator Instructions] We will take our next question from Joe Giordano from Cowen. Please go ahead..

Joe Giordano

Hi, everyone, good morning..

Jigisha Desai

Good morning..

Jim Roberts

Good morning, Joe..

Joe Giordano

So, can you maybe talk a little bit about assets and what we should expect about – what you guys are thinking about that coming next year? I know not a huge dollar amount for you guys relative to what you're seeing in SB 1, but I know from a visibility standpoint and we saw what kind of consternation it caused when there was confusion about what it might look like last time around.

So I guess that as for as next year, any color there will be helpful?.

Jim Roberts

Sure, Joe. In fact that's kind of an interesting thought. I was thinking that might be the first question come out of the box today, and we start thinking about the federal investments program. So, there's a lot of things going on here. Reminder that the FAST Act, $305 billion five-year bill could run through October of 2020.

And the one thing that we always said with the FAST Act that we weren't happy with was that it really didn't shore up the Highway Trust Fund. And we've seen the inadequacy of the solvency of the Highway Trust Fund continue.

I personally, I'm not worried about the exploration date of the FAST Act, because I do believe that if -- worse case scenario, there will be an extension.

But I do believe that today as I mentioned in the discussion earlier there's a real opportunity to get a longer term substantially larger infrastructure build that would incorporate the service transportation component and have the ability to shore up the Highway Trust Fund. And that's our job.

In the next six months through the end of August, our job is to work with Congress and administration to get a longer term substantially higher larger program funded by the Feds not just private sector in place by the end of August. I think we can do it. And I said that in the discussion earlier.

But with that said, we haven't put any of that into our forward-looking guidance at all. And the one thing I have reiterated and I made it clear back in 2015 when the FAST Act for passed, Joe, was that I consider the federal government programs to be the stability. They aren't the drivers of the high earnings and the high revenue growth.

What they are typically is the stability of creating a longer term stable foundation for infrastructure funding. That's what we want out of the Fed's. We don't need them to grow the overall size of the pie, so to speak, because we've already got the healthy states, we got the local, we got the big propositions.

Those are all that are going to be the growth environments. All we want out of the Fed is long-term stability and yes, we want some growth, but it doesn't have to be large growth as well. And as I note, this is an infrastructure bill that we're looking at, not just the transportation bill.

So, we want water, power, and transportation which is what was discussed that was going to be included in the infrastructure bill. So, certainly, it falls right in line with our plan. I'm going to go back and last thing I'll say that FAST Act does sunset in October. I am not concerned about that at all.

They will certainly extend it, if they don't get something done by then, and then the new administration and the new Congress would obviously pass something -- if it didn't get past, they passed something very quickly in 2020, 2021. But I believe there's a good shot we'll get something done by the end of August..

Joe Giordano

That's helpful. Thanks. I wanted to just touch on margins. So, for 2018 for the first half of the year, you're talking 7%, 8% a little bit in 3Q. Obviously, weather was a tremendous impact at end of the year, but also you guys weren't guiding to zero weather I assume.

So, maybe if you can talk about non-weather puts and takes in your EBITDA performance relative to when you guys raised, you said you came in like just about the original -- the low end of the original target..

Jim Roberts

Yes. So, what will happen -- you're exactly right Joe. We had a nice third quarter; we were cranking along and anticipated that that would continue. What happened was that right around Thanksgiving, we started getting rain and -- in the West. And rain is one of those deals where if it dries out quickly and does not rain again, you're fine.

What happened to us was that it rained one day, then it would dry up for three days and would rain five days later. So, really we got foot to a hold around 1st of December. Now, it doesn’t change the margins performance on a project so to speak. But if the amortizing of some of the fixed cost that doesn't occur when the business slows down.

So, it's the people who are managing the field operations that now don't get amortized over the entire revenue stream. It's the slowing down on the materials business because the materials really can't play a part of our construction, because we've shut that part down. It's our equipment coming to a haul.

So, we were certainly on a good role which means that we will be -- continue to be on a good role as soon as Mother Nature allows us to be as we come out of the first quarter and it's really a combination of all those events. It doesn't really change the long-term margin performance of the work.

It just didn’t have a place to amortize and fixed cost in the month of December..

Joe Giordano

That would impact that number?.

Jim Roberts

I'm sorry; I didn't hear quite the question..

Joe Giordano

There was nothing that you call out specifically that was like non-weather related that change your progression?.

Jim Roberts

No, the only thing we mention separately were a couple of large legacy projects that had negative adjustments. But the rest of the work, no. It was just the fact we didn't get to it..

Joe Giordano

Fair enough. Thanks, guys..

Joe Giordano

Okay. Thanks, Joe..

Operator

We will take our next question from Brian Hamilton from Morgan Dempsey Capital Management. Please go ahead..

Brian Rafn

Good morning everybody. This is Brian Rafn.

How are you doing?.

Jim Roberts

Hi, Brian..

Jigisha Desai

Hi, Brian..

Jim Roberts

Good to hear from you..

Brian Rafn

Yeah, let me ask on the transit side guys, what -- if you looked at your sweet spot for job size, you've walked away a little from heavy civil and the design build, what type of revenue size and maybe project duration would be in your sweet spot for the transit side?.

Jim Roberts

You bet, Brian. Well first of all there would be fewer between jobs greater than $1 billion. Although I will say this -- I don't want to say that we won't build a job over $1 billion, but it has to be something right in our wheel house that we have an advantageous position on. So look at jobs less than $1 billion in general and have quicker burn.

And I say, we want jobs that probably last no more than three years, maybe 3.5 years, because we really as we get into these mega jobs, trying to predict the future five years out, it doesn't work. It just doesn't work. You don't know what the markets are going to be like for labor, materials, other resources, the macro environment.

So I'll say 3.5 or less -- $1 billion or less. Design build is, okay. Design build is, okay. But literally speaking only under the premise that we take the lead role in the job, so we want to be in control of our own destiny, Brian. So either we do the job by ourselves or we end up being the lead sponsor on the projects.

We made a strong commitment to ourselves that we’re not going to take a non-sponsored joint venture position going forward, unless it's a special job of some nature. But I don't see any on the horizon in our bidding environment maybe one out of 20 or 30 that might be a non-sponsored and maybe one out of 20 or 30 that will be over $1 billion.

But they got burn fast and we get through and design build is okay, probably less towards the 3P design build would be all right, and ideally negotiated type work will be even better.

CM/GC, CM at risk, progressive design-build where we literally go in and procure the work based on our qualifications with the owner, not by being the low-cost provider upfront.

We believe that there is a way to go approach these more sophisticated jobs and owners where we can both come out in a better position by negotiating the work upfront being very open and transparent as to the type of what's in the bid, what's not in the bid. And what we really want to do is build work and not have disputes with the owners.

Now we don't want any disputes going forward. That is a goal inside Granite. So we build $0.5 billion or $700 million job, and we come out of where the owner shaking hands and there are no disputes and we’re going onto the next job. And we believe the different types of procurement methods will allow that to happen..

Brian Rafn

Got you.

What are you seeing on bid day? How competitive between you guys and other contractors? And then what has kind of evolved relative to your win rates per your bidding quotes today versus where they might have been 4, 5 years ago?.

Jim Roberts

Okay. That's really the genesis of our strategy there Brian. We have no doubt and as we told our investor base we raised our prices. And we started doing that 12, 18 months ago. And with that, we saw 2018 at the lower hit rate than we had previously.

But as we progress through the year, we started seeing our hit rate starting to get better and better and better. And that happens from market to market which all the markets are different. And it's really interesting to watch when these markets get healthy.

When they get healthy, there is somewhat of a saturation point where the competition realizes that they have the ability to go change their margin structure and potentially get the work as well. So we started that a year ago. You can see our backlog is healthy. Our margins are healthier than they were before.

And in the local regional markets those regional players don't have the large capacity. So they see quickly, very quickly that they are saturated and they change their bidding environment which 2019 that is happening and will happen. In the larger project environment, there is an appetite among those competitors both national international players.

But I believe the market is changing there as well Brian not because they're saturated or build up, but because they haven’t done well historically. And they are starting to look at the jobs differently.

And just as Granite started probably 12, 18 months ago, I see our competitors following with being more realistic on productions being understanding what the contractual requirements are, understanding the cash flow, understanding the labor components.

And the opportunity to have higher margins on those projects, I believe the competition is starting to follow our lead; and as it does, I think our win rates will move up. So somebody had to come out of the barrel first, so to speak.

And I'm happy to say that it's paying-off in the backlog that we have today and it is going to -- our win rates in 2019 just in the first couple months is healthy, very healthy.

So I do think that the market is changing and the competition would likely get back to the kind of earnings that they were making 10 years instead of over the last -- they've got used to over the last five years..

Brian Rafn

Got you. And then Jim on the water side, you talked about adding crews and capital little undercapitalized.

How quickly can you expand that and is your expansion moving to plan or you surprised at how much kind of pent-up ability you can add?.

Jim Roberts

So we're moving as planned. And it's probably as difficult as we thought it would be and I -- or not as difficult depending on how you look at. Let me just kind of -- first of all replacing older equipment is the first thing.

So older equipment that is not efficient that causes productions to be reduced in the field, whether its drill rigs, whether its liner crew truck, broilers they call wet-out facilities. We're building a new wet-out facility where we actually prepare the liners to go into the ground. So first of all, it's upgrading the equipment that the teams have.

And that will not necessarily expand revenue, but it will expand productivity which will enhance their margins..

Jigisha Desai

Yes..

Jim Roberts

And then the second thing we're doing is literally adding to the fleet.

And whether it is old drill rigs that we're selling and upgrading or whether it's again new broiler trucks and things of that nature, it costs if you want to even think about one lining crew, you're probably going to spend $2 million to $3 million of capital investment just to build one crew.

And the people who run our lining businesses, certainly are asking for that CapEx and that equipment, so that they can expand their business, which is a good thing, which is really good thing. But we're going to do it very methodically because we want to get the older equipment fixed first and then work on the expansion side.

But they're both going today as planned. And I think the revenue and the bottom line projection so far were actually ahead of what we said we're going to do. And I think both Jigisha and I are comfortable that we will get integration in line as planned and that the operational folks are, I'm going to say, doing as well or better than planned..

Jigisha Desai

I also think there is opportunity for consolidation. This is very fragmented market. And to your point about that how quickly we can get crew up and ready, I mean, this is where the opportunity for bolt-ons come on. And so we're obviously are being very methodical as Jim pointed out on how we look at this opportunity.

But our initial focus has been is really is getting their existing capital assets in line with where we expect our equipment to be and we're definitely investing in that business..

Ron Botoff

It's going well..

Jigisha Desai

It is going really well..

Brian Rafn

Yes. Yes. Let me just ask here you talk, we've always talked about bid day discipline and that.

How relative is that in some of the other or how uniform is that kind of culture applied to the military base side or mining or some of the solar projects, some of them are niche businesses versus say your heavy -- your transit side?.

Jim Roberts

Yes. Well, okay. So believe me and you can imagine Brian knowing as well as you do that we have a similar level of discipline in every one of our operating groups for segments. There is a minimum set of expectations. And across the Granite portfolio, what they have all been given is a minimum set of expectations of a similar nature.

And if the environment that they are in can't reach those minimum thresholds then they need to keep moving into an environment they can. And we have a minimum set of margin expectations on bid day, especially on the larger projects. And if they desire to change that they have to make a call to our group manager or even Jigisha or myself.

And those expectations and patience is paying off and it is interesting. The people who run our businesses in the field wants higher margins as well. So we don't see them being as aggressive as maybe three years ago when the market was so tight that they didn't have any work, Brian.

Today some times I am more aggressive on these jobs than our operation folks. They have really created discipline and patients so that everything that we get today is value creation. It's not a revenue driver. It is revenue and bottom line..

Jigisha Desai

Yes. And as part of my quarterly review with the operations leadership team, I ask that question and after the third quarter, saying, given our hit ratio had been impacted, do we want to revisit the bid day expectations. And every one of them had said, no, they need to be patient.

So it's really nice to hear from our operational leadership to say, we just need to be patient and the work is on our way. So I....

Jim Roberts

And obviously it's you..

Jigisha Desai

Right..

Jim Roberts

So it's the whole -- everybody believes in our plan, Brian..

Brian Rafn

Got you, got you. Just one more, Jim.

Vertical integration on the quarry side or material side, east of the Mississippi River, still a challenge?.

Jim Roberts

Still a challenge, but still a desire and a strong desire. And I would tell you, we've actively engaged in opportunities east of the Mississippi where we're not successful in 2018 and we are not done. We are going to get east of the Mississippi.

Or I will say this, we're going to continually work our way east until we get all the way to the Atlantic Ocean..

Jigisha Desai

There you go. Yes..

Brian Rafn

All right, guys. Thanks..

Jim Roberts

Thanks, Brian..

Operator

This concludes our question-and-answer session. I would like to turn the conference back over to our host for any closing remarks..

Jim Roberts

All right, everybody. Well, thank you for your questions. Quick note for our shareholders and investors that Jigisha, Ron and I will be on the road and at conferences visiting our operations and investors around the country throughout 2019. So please reach out to Ron. And we will look forward to speaking with you and meeting with you.

And as always thanking all of our employees for keeping your fellow workers safe and for exhibiting Granite's core values every single day. As always, Jigisha, Ron and I are available to follow-up, if anybody has any further questions. And everybody have a great day. Thank you..

Jigisha Desai

Thank you..

Operator

The conference has now concluded. Thank you for attending today's presentation..

ALL TRANSCRIPTS
2024 Q-3 Q-2 Q-1
2023 Q-4 Q-3 Q-2 Q-1
2022 Q-4 Q-3 Q-2 Q-1
2021 Q-4 Q-3 Q-2 Q-1
2020 Q-4 Q-3
2019 Q-3 Q-2 Q-1
2018 Q-4 Q-3 Q-2 Q-1
2017 Q-4 Q-3 Q-2 Q-1
2016 Q-4 Q-3 Q-2 Q-1
2015 Q-4 Q-3 Q-2 Q-1
2014 Q-4 Q-3 Q-2 Q-1